BP112086 - 136 Black Powder Tr -- Scanned
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search Again| BP112086 - 136 Black Powder Tr -- Scanned | |
|---|---|
| Neighbourhood: | Departure Bay |
| Street Address: | 136 Black Powder Tr -- Scanned |
| Type of Application: | Single / Two Family Dwelling |
| File Number: | BP112086 |
| Date Application Submitted: | September 24, 2007 |
| Application Description: |
Approx 2 x 10 ft front bedroom addition and 6 x 12 ft front entrance addition to existing single family dwelling. Revision March 20, 2008 closet removed from foyer addition as existing house studio room has no footing under, was originally carport. DKF |
| Application Status: | COMPLETED |
| Permit Value: | $11,748.86 |
| Building Area: |
9.12 M2 98.17 ft2 |
| Issued Date: | February 07, 2008 |
| File Close Date: | January 17, 2012 |
| Expiry Date: | February 07, 2010 |
Associated Properties
| Address | Zone | More |
|---|---|---|
| 136 BLACK POWDER TRAIL | R5 | Property Report |
Process Steps
| Task | Status |
|---|---|
|
FOOTING / FORMS
Inspection of forms prior to any concrete being poured |
PASSED |
|
PERIMETER DRAIN
For perimeter drain , foundation walls should be damp proofed and drain tile in place with drain rock covering |
PARTIAL |
|
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
PARTIAL |
|
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
PARTIAL |
|
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
PASSED |
|
FRAMING
Rough in plumbing and electrical must be complete. Survey Certificate & Truss Layouts required for approval |
PARTIAL |
|
FRAMING
Rough in plumbing and electrical must be complete. Survey Certificate & Truss Layouts required for approval |
PASSED |
|
INSULATION
Insulation and vapour barrier to be complete prior to inspection |
FAILED |
|
INSULATION
Insulation and vapour barrier to be complete prior to inspection |
PASSED |
|
FINAL
Final approval as per requirements on plans. |
FAILED |
|
FINAL
Final approval as per requirements on plans. |
FAILED |
|
FINAL
Final approval as per requirements on plans. |
PASSED
2012-01-17 |
| Map |
|---|
View in Google Earth (KML)
|
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.

View in Google Earth (KML)