BP111941 - 639 Seventh (Parent) 627 Seventh Phase 5 SL15 VIS6562 Scanned
Neighbourhood: Harewood    
Street Address: 639 Seventh (Parent) 627 Seventh Phase 5 SL15 VIS6562 Scanned
Type of Application: Commercial / Multi / Industrial
File Number: BP111941
Date Application Submitted: July 11, 2007
Application Description: Oakhills Vista - 27 unit multi-family site. Phase 5 (Two units (SFD) multi-family Dev. -- Units 14 & 15)

Electronic File only

INSPECTIONS ONLY FOR UNIT 15 -- 627 SEVENTH STREET

see CIB01148 for info -- all phases

Revision:
Changed location of 16' x 10 ' deck to rear.
07/23/09 KM
Application Status: COMPLETED
Builder: OAKHILLS VISTA DEVELOPMENTS LTD
Issued Date: March 31, 2009
File Close Date: November 23, 2010

Associated Properties

Address Zone More
627 SEVENTH STREET R6 Property Report
625 SEVENTH STREET R6 Property Report

Process Steps

Task Status
FOOTING/FORMS

Inspection of forms prior to any cement being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite.

PASSED
PERIMETER DRAIN

For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering.

FAILED
PERIMETER DRAIN

For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering.

PASSED
UNDERSLAB PLUMBING

complete underslab plumbing must be visible.

PASSED
UNDERSLAB INSULATION

Inspection required prior to placing slab concrete.

PASSED
STORM CONNECTION

Pipe and connection must be visible for inspection.

PASSED
SANITARY CONNECTION

Pipe and connection must be visible for inspection.

PASSED
WATER CONNECTION

Pipe and connection must be visible for inspection.

PASSED
ROUGH IN PLUMBING

Rough in plumbing must be complete including potable water piping.

PARTIAL
ROUGH IN PLUMBING

Rough in plumbing must be complete including potable water piping.

PARTIAL
ROUGH IN SPRINKLER

Rough in sprinkler must be complete and visable for inspection.

PASSED
FRAMING

Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval.

FAILED
FRAMING

Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval.

FAILED
FRAMING

Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval.

FAILED
FRAMING

Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval.

PASSED
INSULATION

Insulation and vapour barrier to be complete prior to inspection.

FAILED
INSULATION

Insulation and vapour barrier to be complete prior to inspection.

PASSED
SPRINKLER FINAL-OLD

Sprinkler system must be complete and operating as intended.

PARTIAL
OCCUPANCY-OLD FAILED
OCCUPANCY-OLD PASSED

2009-10-26

Map
View in Google Earth (KML)


Disclaimer:

The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo. Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation. The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.

The Information Provided within this website is for Informational Purposes Only. It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.