BP111846 - 3002 Charles street
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search Again| BP111846 - 3002 Charles street | |
|---|---|
| Neighbourhood: | Departure Bay |
| Street Address: | 3002 Charles street |
| Type of Application: | Single / Two Family Dwelling |
| File Number: | BP111846 |
| Date Application Submitted: | July 27, 2007 |
| Application Description: |
construct a one storey sfd with crawl space and attached garage. Revision -move front door, add three windows to bedroom. Spatial okay.June 5/08. MV Revision July 15/08 1. Add 1'9" bumpout to ensuite, eliminate window 2. Move fireplace, change windows in family room to 5'0 X 4'6 3. Add 2'0 X 5'0 window in foyer 4 Add area to foyer DKF Revision July 21/2008 changed back covered patio to partially covered plywood deck with 60 mil vinyl decking. Additional fees for re-inspection,and square footage. IR |
| Application Status: | COMPLETED |
| Permit Value: | $213,773.90 |
| Building Area: |
164.62 M2 1,771.95 ft2 |
| Builder: | DOVER BAY CONSTRUCTION LTD |
| Issued Date: | June 04, 2008 |
| File Close Date: | September 25, 2008 |
Associated Properties
| Address | Zone | More |
|---|---|---|
| 3002 CHARLES STREET | R5 | Property Report |
Process Steps
| Task | Status |
|---|---|
|
FOOTING / FORMS
Inspection of forms prior to any concrete being poured |
PARTIAL |
|
FOOTING / FORMS
Inspection of forms prior to any concrete being poured |
PASSED |
|
PERIMETER DRAIN
For perimeter drain , foundation walls should be damp proofed and drain tile in place with drain rock covering |
PASSED |
|
STORM CONNECTION
Pipe and Connection must be visible for inspection |
PASSED |
|
SANITARY CONNECTION
Pipe and Connection must be visible for inspection |
FAILED |
|
SANITARY CONNECTION
Pipe and Connection must be visible for inspection |
PASSED |
|
WATER CONNECTION
Pipe and Connection must be visable for inspection |
PASSED |
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping |
PARTIAL |
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping |
PASSED |
|
FRAMING
Rough in plumbing and electrical must be complete. Survey Certificate & Truss Layouts required for approval |
PASSED |
|
INSULATION
Insulation and vapour barrier to be complete prior to inspection |
PASSED |
|
OCCUPANCY-OLD
Exterior of house must be complete including stairs, decks, handrails, porches and exterior finish |
PASSED
2008-09-25 |
| Map |
|---|
View in Google Earth (KML)
|
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.

View in Google Earth (KML)