BP111825 - #130 & #140 - 2124 Bowen Road
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search Again| BP111825 - #130 & #140 - 2124 Bowen Road | |
|---|---|
| Neighbourhood: | Northfield |
| Street Address: | #130 & #140 - 2124 Bowen Road |
| Type of Application: | Leasehold Improvements |
| File Number: | BP111825 |
| Date Application Submitted: | July 20, 2007 |
| Application Description: |
Park Place Sleep Clinic - 246.7m2 "D" occupancy. Tenant improvements includes sprinkler heads moved, lowered and added, one "universal" washroom with "accessible" shower, one other washroom with shower, kitchen, laundry room, 4 sleep rooms. Existing 1 hr FS/FRR between main floor "D" and second floor "C" occupancies. No vertical FS/FRR between suites of "D" occupancy required. Building Classification: 3.2.2.54. or 3.2.2.48. Group D / C occupancy, 3 storey with parking garage below as separate building. Sprinklered with fire alarm, combustible construction ok. Sept. 26, 2007 - "universal" washroom layout changed. VS Oct. 04 - BI does not believe change proposed complies with code. New idea for layout sent to Gord, no response. Gord says PI and plumber are working out issue. VS |
| Application Status: | COMPLETED |
| Permit Value: | $125,000.00 |
| Builder: | MOUNTAIN VISTA PROPERTIES LTD |
| Issued Date: | September 26, 2007 |
| File Close Date: | December 20, 2007 |
Associated Properties
| Address | Zone | More |
|---|---|---|
| 130 2124 BOWEN ROAD | COR2 | Property Report |
| 140 2124 BOWEN ROAD | COR2 | Property Report |
Process Steps
| Task | Status |
|---|---|
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
FAILED |
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PASSED |
|
FRAMING
Rough in plumbing and electrical must be complete. Survey Certificate and Truss Layouts required for approval. |
FAILED |
|
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
FAILED |
|
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PARTIAL |
|
PLUMBING FINAL-OLD
All fixtures must be in place. |
FAILED |
|
PLUMBING FINAL-OLD
All fixtures must be in place. |
PARTIAL |
|
PLUMBING FINAL-OLD
All fixtures must be in place. |
FAILED |
|
PLUMBING FINAL-OLD
All fixtures must be in place. |
PASSED |
|
SPRINKLER FINAL-OLD
Sprinkler system must be complete and operating as intended. |
FAILED |
|
SPRINKLER FINAL-OLD
Sprinkler system must be complete and operating as intended. |
PARTIAL |
|
SPRINKLER FINAL-OLD
Sprinkler system must be complete and operating as intended. |
FAILED |
|
SPRINKLER FINAL-OLD
Sprinkler system must be complete and operating as intended. |
PASSED |
|
FINAL-OLD
Final Approval as per requirements on plans. |
CANCELLED |
|
FINAL-OLD
Final Approval as per requirements on plans. |
FAILED |
|
FINAL-OLD
Final Approval as per requirements on plans. |
PASSED
2007-12-21 |
| Map |
|---|
View in Google Earth (KML)
|
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.

View in Google Earth (KML)