BP111818 - 530 Fifth (Parent) -- 520 (Bldg C),540 (Bldg D),550 (Bldg E) Fifth 3 New Bldgs - Phase 1

Interested in this application? Login to manage subscriptions to subscribe to updates!

Search Again
BP111818 - 530 Fifth (Parent) -- 520 (Bldg C),540 (Bldg D),550 (Bldg E) Fifth 3 New Bldgs - Phase 1
Neighbourhood: University District    
Street Address: 530 Fifth (Parent) -- 520 (Bldg C),540 (Bldg D),550 (Bldg E) Fifth 3 New Bldgs - Phase 1
Type of Application: Commercial / Multi / Industrial
File Number: BP111818
Date Application Submitted: July 18, 2007
Application Description: University Village (formally Harewood Mall) Phase I of 3 phases,3 new one storey shell bldgs in phase 1.Future permits required to C & O the suites. Underslab main plumbing lines installed.No washroom rough-in included in this permit. Foundations under BP111953
Bldg C - 520 Fifth Street, 539.1m2 office "D", Part 9, combustible const., sprinklered, fire alarm, main permit & inspections for Bld C under BP111818
Bldg D - 540 Fifth Street, 432.9m2 assembly "A-2" & retail E" 3.2.2.27. & 3.2.2.62., combustible const., sprinklered, fire alarm system,inspection under BP111954
Bldg E - 550 Fifth Street, 982.9m2 retail "E" 3.2.2.62.,combustible const, fire alarm,sprinklered, inspection under BP111955
02/15/08 Sprinkler Drawings & B1, B2 Ardashirov for Bld "E" approved. 04/2/08 Add underslab plumb. for BLD "D",future Subway TI. B1,B2&C. Powell, Mec. Eng
07/7/08 Bld "D" 2hr demising walls between suites. Sprinkler draw. & B1/B2 for Bld "D"
02/19/09 Bld "C" sprinkler draw. & B1/B2. VS

Application Status: COMPLETED
Permit Value: $1,512,000.00
Issued Date: December 13, 2007
File Close Date: March 01, 2010

Process Steps

Task Status
FOOTING/FORMS

Inspection of forms prior to any cement being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite.

PASSED
PERIMETER DRAIN

For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering.

PASSED
ROUGH IN PLUMBING

Rough in plumbing must be complete including potable water piping.

FAILED
ROUGH IN PLUMBING

Rough in plumbing must be complete including potable water piping.

FAILED
ROUGH IN PLUMBING

Rough in plumbing must be complete including potable water piping.

PARTIAL
INSULATION

Insulation and vapour barrier to be complete prior to inspection.

PASSED
SPRINKLER FINAL-OLD

Sprinkler system must be complete and operating as intended.

PARTIAL
PLUMBING FINAL-OLD

All fixtures must be in place.

PASSED
PLUMBING FINAL-OLD

All fixtures must be in place.

PASSED
FINAL-OLD

Final approval as per requirements on plans.

PASSED

2010-03-01

Map
View in Google Earth (KML)


Disclaimer:

The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo. Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation. The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.