BP111818 - 530 Fifth (Parent) -- 520 (Bldg C),540 (Bldg D),550 (Bldg E) Fifth 3 New Bldgs - Phase 1
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search Again| BP111818 - 530 Fifth (Parent) -- 520 (Bldg C),540 (Bldg D),550 (Bldg E) Fifth 3 New Bldgs - Phase 1 | |
|---|---|
| Neighbourhood: | University District |
| Street Address: | 530 Fifth (Parent) -- 520 (Bldg C),540 (Bldg D),550 (Bldg E) Fifth 3 New Bldgs - Phase 1 |
| Type of Application: | Commercial / Multi / Industrial |
| File Number: | BP111818 |
| Date Application Submitted: | July 18, 2007 |
| Application Description: |
University Village (formally Harewood Mall) Phase I of 3 phases,3 new one storey shell bldgs in phase 1.Future permits required to C & O the suites. Underslab main plumbing lines installed.No washroom rough-in included in this permit. Foundations under BP111953 Bldg C - 520 Fifth Street, 539.1m2 office "D", Part 9, combustible const., sprinklered, fire alarm, main permit & inspections for Bld C under BP111818 Bldg D - 540 Fifth Street, 432.9m2 assembly "A-2" & retail E" 3.2.2.27. & 3.2.2.62., combustible const., sprinklered, fire alarm system,inspection under BP111954 Bldg E - 550 Fifth Street, 982.9m2 retail "E" 3.2.2.62.,combustible const, fire alarm,sprinklered, inspection under BP111955 02/15/08 Sprinkler Drawings & B1, B2 Ardashirov for Bld "E" approved. 04/2/08 Add underslab plumb. for BLD "D",future Subway TI. B1,B2&C. Powell, Mec. Eng 07/7/08 Bld "D" 2hr demising walls between suites. Sprinkler draw. & B1/B2 for Bld "D" 02/19/09 Bld "C" sprinkler draw. & B1/B2. VS |
| Application Status: | COMPLETED |
| Permit Value: | $1,512,000.00 |
| Issued Date: | December 13, 2007 |
| File Close Date: | March 01, 2010 |
Process Steps
| Task | Status |
|---|---|
|
FOOTING/FORMS
Inspection of forms prior to any cement being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. |
PASSED |
|
PERIMETER DRAIN
For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering. |
PASSED |
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
FAILED |
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
FAILED |
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PARTIAL |
|
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PASSED |
|
SPRINKLER FINAL-OLD
Sprinkler system must be complete and operating as intended. |
PARTIAL |
|
PLUMBING FINAL-OLD
All fixtures must be in place. |
PASSED |
|
PLUMBING FINAL-OLD
All fixtures must be in place. |
PASSED |
|
FINAL-OLD
Final approval as per requirements on plans. |
PASSED
2010-03-01 |
| Map |
|---|
View in Google Earth (KML)
|
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.

View in Google Earth (KML)