BP111801 - 6000 Uplands Drive (parent) Future Address 6215 Washington Way (6) - Drawings Scanned/Attached
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search Again| BP111801 - 6000 Uplands Drive (parent) Future Address 6215 Washington Way (6) - Drawings Scanned/Attached | |
|---|---|
| Neighbourhood: | Rutherford |
| Street Address: | 6000 Uplands Drive (parent) Future Address 6215 Washington Way (6) - Drawings Scanned/Attached |
| Type of Application: | Commercial / Multi / Industrial |
| File Number: | BP111801 |
| Date Application Submitted: | July 17, 2007 |
| Application Description: |
Strathcona Estates - Washington Way - Multi family development - 14 single family houses in 3 phases. Phase 2 - units 6 to 10, one & one half storey and two storey sprinklered single family dwellings on crawl space with attached unsprinklered garages. On and off-site servicing under BP110689. UNIT 6 -- 6215 Washington Way 149.5m2 gross floor area, 41.7m2 garage inspections under this permit UNIT 7 -- 6216 Washington Way 180.6m2 gross floor area, 42.9m2 garage -- see BP111961 for inspections. UNIT 8 -- 6219 Washington Way 180.6m2 gross floor area, 42.9m2 garage -- see BP111962 for inspections. UNIT 9 -- 6220 Washington Way 180.6m2 gross floor area, 42.9m2 garage -- see BP111963 for inspections. UNIT 10 -- 6223 Washington Way 180.6m2 gross floor area, 42.9m2 garage -- see BP111964 for inspections. July 4, 08 Unit 7 - sink added in garage. VS |
| Application Status: | COMPLETED |
| Permit Value: | $1,043,327.00 |
| Builder: | KUNA ENTERPRISES LTD |
| Issued Date: | November 28, 2007 |
| File Close Date: | May 20, 2009 |
Associated Properties
| Address | Zone | More |
|---|---|---|
| 6215 WASHINGTON WAY | R8 | Property Report |
| 6216 WASHINGTON WAY | R8 | Property Report |
| 6219 WASHINGTON WAY | R8 | Property Report |
| 6220 WASHINGTON WAY | R8 | Property Report |
| 6223 WASHINGTON WAY | R8 | Property Report |
Process Steps
| Task | Status |
|---|---|
|
FOOTING/FORMS
Inspection of forms prior to any cement being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. |
PASSED |
|
PERIMETER DRAIN
For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering. |
FAILED |
|
PERIMETER DRAIN
For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering. |
PASSED |
|
PERIMETER DRAIN
For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering. |
CANCELLED |
|
STORM CONNECTION
Pipe and connection must be visible for inspection. |
PASSED |
|
SANITARY CONNECTION
Pipe and connection must be visible for inspection. |
PASSED |
|
WATER CONNECTION
Pipe and connection must be visible for inspection. |
PARTIAL |
|
WATER CONNECTION
Pipe and connection must be visible for inspection. |
PASSED |
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PASSED |
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PASSED |
|
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
CANCELLED |
|
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
PASSED |
|
ROUGH IN SPRINKLER
Rough in sprinkler must be complete and visable for inspection. |
PASSED |
|
ROUGH IN SPRINKLER
Rough in sprinkler must be complete and visable for inspection. |
PARTIAL |
|
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PASSED |
|
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
CANCELLED |
|
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PARTIAL |
|
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PASSED |
|
SPRINKLER FINAL-OLD
Sprinkler system must be complete and operating as intended. |
PARTIAL |
|
SPRINKLER FINAL-OLD
Sprinkler system must be complete and operating as intended. |
PASSED |
| OCCUPANCY-OLD | CANCELLED |
| OCCUPANCY-OLD | FAILED |
| OCCUPANCY-OLD |
PASSED
2009-05-20 |
| Map |
|---|
View in Google Earth (KML)
|
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.

View in Google Earth (KML)