BP111785 - 6202 Dunbar (Parent) P5 - Bldg 12 6287 Pleasant Ridge SL21,22 VIS6634-- Scanned

Interested in this application? Login to manage subscriptions to subscribe to updates!

Search Again
BP111785 - 6202 Dunbar (Parent) P5 - Bldg 12 6287 Pleasant Ridge SL21,22 VIS6634-- Scanned
Neighbourhood: Pleasant Valley    
Street Address: 6202 Dunbar (Parent) P5 - Bldg 12 6287 Pleasant Ridge SL21,22 VIS6634-- Scanned
Type of Application: Commercial / Multi / Industrial
File Number: BP111785
Date Application Submitted: May 05, 2008
Application Description: 30 unit patio home development "Pleasant Ridge Estates" Phase 5

Electronic file only INSPECTIONS ONLY

Unit 21 = 102 - 6287 Pleasant Ridge Place
Unit 22 = 101 - 6287 Pleasant Ridge Place (DUPLEX)

See BP111450 for Building Permit Information

Revision:
Duplex was built in reverse on site.
10/28/09 KM
Application Status: COMPLETED
Builder: DUECK GENERAL CONTRACTING
Issued Date: September 22, 2008
File Close Date: April 28, 2011

Associated Properties

Address Zone More
6202 DUNBAR ROAD R6 Property Report
102   6287 PLEASANT RIDGE PLACE R6 Property Report
101   6287 PLEASANT RIDGE PLACE R6 Property Report

Process Steps

Task Status
FOOTING/FORMS

Inspection of forms prior to any cement being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite.

PASSED
PERIMETER DRAIN

For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering.

PARTIAL
UNDERSLAB PLUMBING

complete underslab plumbing must be visible.

PASSED
UNDERSLAB INSULATION

Inspection required prior to placing slab concrete.

PASSED
STORM CONNECTION

Pipe and connection must be visible for inspection.

PASSED
SANITARY CONNECTION

Pipe and connection must be visible for inspection.

PASSED
WATER CONNECTION

Pipe and connection must be visible for inspection.

PASSED
ROUGH IN PLUMBING

Rough in plumbing must be complete including potable water piping.

PARTIAL
ROUGH IN PLUMBING

Rough in plumbing must be complete including potable water piping.

PASSED
FRAMING

Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval.

PASSED
INSULATION

Insulation and vapour barrier to be complete prior to inspection.

PASSED
SPRINKLER FINAL-OLD

Sprinkler system must be complete and operating as intended.

PARTIAL
SPRINKLER FINAL-OLD

Sprinkler system must be complete and operating as intended.

PASSED
OCCUPANCY-OLD FAILED
OCCUPANCY-OLD PASSED

2011-04-28

Map
View in Google Earth (KML)


Disclaimer:

The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo. Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation. The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.