BP111784 - 6202 Dunbar (parent) P5 - Bldg 11 6281 Pleasant Ridge SL19,20 VIS6634-Scanned
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search Again| BP111784 - 6202 Dunbar (parent) P5 - Bldg 11 6281 Pleasant Ridge SL19,20 VIS6634-Scanned | |
|---|---|
| Neighbourhood: | Pleasant Valley |
| Street Address: | 6202 Dunbar (parent) P5 - Bldg 11 6281 Pleasant Ridge SL19,20 VIS6634-Scanned |
| Type of Application: | Commercial / Multi / Industrial |
| File Number: | BP111784 |
| Date Application Submitted: | May 05, 2008 |
| Application Description: |
30 unit patio home development "Pleasant Ridge Estates" Phase 5 Electronic file only INSPECTIONS ONLY Unit 19 = 101 - 6281 Pleasant Ridge Place Unit 20 = 102 - 6281 Pleasant Ridge Place (DUPLEX) See BP111450 for Building Permit Information Revision: right side of duplex now resembles left side in great room for the fireplace and the sliding patio doors. 11/02/09 KM |
| Application Status: | COMPLETED |
| Builder: | DUECK GENERAL CONTRACTING |
| Issued Date: | September 22, 2008 |
| File Close Date: | March 08, 2010 |
Associated Properties
| Address | Zone | More |
|---|---|---|
| 6202 DUNBAR ROAD | R6 | Property Report |
| 101 6281 PLEASANT RIDGE PLACE | R6 | Property Report |
| 102 6281 PLEASANT RIDGE PLACE | R6 | Property Report |
Process Steps
| Task | Status |
|---|---|
|
FOOTING/FORMS
Inspection of forms prior to any cement being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. |
PASSED |
|
PERIMETER DRAIN
For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering. |
PASSED |
|
STORM CONNECTION
Pipe and connection must be visible for inspection. |
PASSED |
|
SANITARY CONNECTION
Pipe and connection must be visible for inspection. |
PASSED |
|
WATER CONNECTION
Pipe and connection must be visible for inspection. |
PASSED |
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PASSED |
|
ROUGH IN SPRINKLER
Rough in sprinkler must be complete and visable for inspection. |
PARTIAL |
|
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PARTIAL |
|
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PASSED |
|
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PARTIAL |
|
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PASSED |
|
SPRINKLER FINAL-OLD
Sprinkler system must be complete and operating as intended. |
PARTIAL |
| OCCUPANCY-OLD | PARTIAL |
| OCCUPANCY-OLD |
PASSED
2010-03-09 |
| Map |
|---|
View in Google Earth (KML)
|
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.

View in Google Earth (KML)