BP111782 - 6202 Dunbar (Parent) P4 - Bldg 9 6269 Pleasant Ridge SL15,16 VIS6634- Scanned

Interested in this application? Login to manage subscriptions to subscribe to updates!

Search Again
BP111782 - 6202 Dunbar (Parent) P4 - Bldg 9 6269 Pleasant Ridge SL15,16 VIS6634- Scanned
Neighbourhood: Pleasant Valley    
Street Address: 6202 Dunbar (Parent) P4 - Bldg 9 6269 Pleasant Ridge SL15,16 VIS6634- Scanned
Type of Application: Commercial / Multi / Industrial
File Number: BP111782
Date Application Submitted: April 27, 2007
Application Description: 30 unit patio home development "Pleasant Ridge Estates" Phase 4

Electronic file only INSPECTIONS ONLY

Unit 15 = 101 - 6269 Pleasant Ridge Place
Unit 16 = 102 - 6269 Pleasant Ridge Place (DUPLEX)

See BP111450 for Building Permit Information

Revision submitted Sept. 16, 2008
1) Exchanging location of side concrete patio, door & windows with fireplace in unit #16. AG

Revision: 09/04/09 KM
add two windows and door to left side (unit # 15)
fireplace relocated to rear wall at patio.
Application Status: COMPLETED
Builder: DUECK GENERAL CONTRACTING
Issued Date: October 12, 2007
File Close Date: January 21, 2011

Associated Properties

Address Zone More
6202 DUNBAR ROAD R6 Property Report
101   6269 PLEASANT RIDGE PLACE R6 Property Report
102   6269 PLEASANT RIDGE PLACE R6 Property Report

Process Steps

Task Status
FOOTING/FORMS

Inspection of forms prior to any cement being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite.

PASSED
PERIMETER DRAIN

For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering.

PASSED
UNDERSLAB PLUMBING

complete underslab plumbing must be visible.

CANCELLED
STORM CONNECTION

Pipe and connection must be visible for inspection.

PASSED
SANITARY CONNECTION

Pipe and connection must be visible for inspection.

PASSED
WATER CONNECTION

Pipe and connection must be visible for inspection.

PASSED
ROUGH IN PLUMBING

Rough in plumbing must be complete including potable water piping.

PASSED
ROUGH IN SPRINKLER

Rough in sprinkler must be complete and visable for inspection.

PARTIAL
FRAMING

Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval.

FAILED
FRAMING

Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval.

PASSED
INSULATION

Insulation and vapour barrier to be complete prior to inspection.

PASSED
SPRINKLER FINAL-OLD

Sprinkler system must be complete and operating as intended.

PARTIAL
OCCUPANCY-OLD FAILED
OCCUPANCY-OLD PARTIAL
OCCUPANCY-OLD FAILED
OCCUPANCY-OLD PARTIAL
OCCUPANCY-OLD PASSED

2011-04-28

Map
View in Google Earth (KML)


Disclaimer:

The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo. Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation. The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.

The Information Provided within this website is for Informational Purposes Only. It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.