BP111770 - 639 Seventh (parent) 800 Oakhills Vista Phase 4 SL 11 VIS6562-- Scanned

Interested in this application? Login to manage subscriptions to subscribe to updates!

Search Again
BP111770 - 639 Seventh (parent) 800 Oakhills Vista Phase 4 SL 11 VIS6562-- Scanned
Neighbourhood: Harewood    
Street Address: 639 Seventh (parent) 800 Oakhills Vista Phase 4 SL 11 VIS6562-- Scanned
Type of Application: Commercial / Multi / Industrial
File Number: BP111770
Date Application Submitted: July 11, 2007
Application Description: Oakhills Vista - 27 unit multi-family site, Phase 4 main file for 3 SFD units. Units 11,12 & 13 are two storey, sprinklered single family dwellings with attached unsprinklered double garages. 3/4 hr fire resistance rating required on portions of the building face closer than 1.2 m to the centreline between buildings.

Unit 11 -- 800 Oakhills Vista -- 161.1m2 + 43.7m2 Garage, inspections under this permit
Unit 12 -- 633 Seventh Street --177.2m2 + 39.8m2 Garage, inspections under BP111948
Unit 13 -- 631 Seventh Street -- 178.2m2 + 39.8m2 Garage, inspections under BP111949

April 25, 2008 Revisions include adding electrical room (with sprinkler head), delete window behind room; change garage doors from double to single door; add window in bathroom upper floor. VS
Application Status: COMPLETED
Permit Value: $840,000.00
Builder: OAKHILLS VISTA DEVELOPMENTS LTD
Issued Date: February 26, 2008
File Close Date: May 05, 2009

Associated Properties

Address Zone More
800 OAKHILLS VISTA R6 Property Report

Process Steps

Task Status
FOOTING/FORMS

Inspection of forms prior to any cement being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite.

PASSED
PERIMETER DRAIN

For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering.

PASSED
UNDERSLAB PLUMBING

complete underslab plumbing must be visible.

PASSED
STORM CONNECTION

Pipe and connection must be visible for inspection.

PASSED
SANITARY CONNECTION

Pipe and connection must be visible for inspection.

PASSED
WATER CONNECTION

Pipe and connection must be visible for inspection.

PASSED
ROUGH IN PLUMBING

Rough in plumbing must be complete including potable water piping.

CANCELLED
ROUGH IN PLUMBING

Rough in plumbing must be complete including potable water piping.

PARTIAL
ROUGH IN PLUMBING

Rough in plumbing must be complete including potable water piping.

FAILED
ROUGH IN PLUMBING

Rough in plumbing must be complete including potable water piping.

PASSED
FRAMING

Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval.

PASSED
INSULATION

Insulation and vapour barrier to be complete prior to inspection.

FAILED
INSULATION

Insulation and vapour barrier to be complete prior to inspection.

PASSED
SPRINKLER FINAL-OLD

Sprinkler system must be complete and operating as intended.

PARTIAL
OCCUPANCY-OLD PASSED

2009-05-05

Map
View in Google Earth (KML)


Disclaimer:

The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo. Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation. The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.