BP111769 - 639 Seventh (parent) 637 Seventh Phase 3 SL8 VIS6562 -- Scanned

Interested in this application? Login to manage subscriptions to subscribe to updates!

Search Again
BP111769 - 639 Seventh (parent) 637 Seventh Phase 3 SL8 VIS6562 -- Scanned
Neighbourhood: Harewood    
Street Address: 639 Seventh (parent) 637 Seventh Phase 3 SL8 VIS6562 -- Scanned
Type of Application: Commercial / Multi / Industrial
File Number: BP111769
Date Application Submitted: July 11, 2007
Application Description: Oakhills Vista - 27 unit multi-family site, Phase 3 [3 units (SFD) multi-family Dev. -- Units 8, 9, & 10]
Unit 8, 9 & 10 are two storey, sprinklered single family dwellings with attached double garages.

Unit 8 - 637 Seventh Street - 175.1m2 + 39.8m2 Garage inspections under this permit
Unit 9 - 635 Seventh Street - 175.1m2 + 39.8m2 Garage - see BP111946 [inspections only]
Unit 10 - 801 Oakhills Vista - 161.1m2 + 43.7m2 Garage - see BP111947 [inspections only]

Nov. 7, 07 Deck added + reconfiguation of main floor plan to accomodate deck for units 8 & 9. VS
Feb. 4, 08 Window in unsprinklered garage of unit 8, & garage stair well of unit 10 to be deleted to meet spatial separation requirements. VS
April 25, 08 Unit 10 - change from 2 garage doors to one 16' door; change roofline of entrance porch; remove window in garage and move garage man door; add window in 2nd floor bathrm. VS

see CIB01148 for info -- all phases

Physical File Scanned + attached Apr 6, 2009 db
Application Status: COMPLETED
Permit Value: $840,000.00
Builder: OAKHILLS VISTA DEVELOPMENTS LTD
Issued Date: September 25, 2007
File Close Date: December 23, 2008

Associated Properties

Address Zone More
637 SEVENTH STREET R6 Property Report
625 SEVENTH STREET R6 Property Report

Process Steps

Task Status
FOOTING/FORMS

Inspection of forms prior to any cement being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite.

CANCELLED
FOOTING/FORMS

Inspection of forms prior to any cement being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite.

PASSED
PERIMETER DRAIN

For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering.

PASSED
UNDERSLAB PLUMBING

complete underslab plumbing must be visible.

PASSED
STORM CONNECTION

Pipe and connection must be visible for inspection.

PASSED
SANITARY CONNECTION

Pipe and connection must be visible for inspection.

PASSED
WATER CONNECTION

Pipe and connection must be visible for inspection.

PASSED
ROUGH IN PLUMBING

Rough in plumbing must be complete including potable water piping.

CANCELLED
ROUGH IN PLUMBING

Rough in plumbing must be complete including potable water piping.

PASSED
FRAMING

Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval.

PASSED
INSULATION

Insulation and vapour barrier to be complete prior to inspection.

PASSED
SPRINKLER FINAL-OLD

Sprinkler system must be complete and operating as intended.

PARTIAL
SPRINKLER FINAL-OLD

Sprinkler system must be complete and operating as intended.

FAILED
OCCUPANCY-OLD FAILED
OCCUPANCY-OLD FAILED
OCCUPANCY-OLD PASSED

2008-12-23

Map
View in Google Earth (KML)


Disclaimer:

The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo. Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation. The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.