BP111627 - 4088 Wellesley
Neighbourhood: Rutherford    
Street Address: 4088 Wellesley
Type of Application: Commercial / Multi-Res Alteration
File Number: BP111627
Date Application Submitted: June 07, 2007
Application Description: Lakeside Gardens - Bld A - internal alterations to seniors residential facility. Lakeside Gardens - Bld A - internal alterations to seniors residential facility. Work includes changing existing common use kitchen on floors 2, 3, 4 into 48.06 m2 new suite on each floor & changing the lounges to kitchens for common use of floor residence. Main floor lounge changed to computer library/office & separate storage room. Double doors with 1.5hr rating to remain in place. 1 hr fire separation for residential suites.

Existing 4 storey, combustible, Group C, sprinklered building divided into three buildings with a 2 hr firewall. Bld A 936.4m2, Bld B 991.2, Bld C 781.1m2
Reclassified under BCBC 2006 as 3.2.2.45. sprinklered, 1 hr fire separation of floors and 1 hr FRR for supports, combustible or non-combustible construction.
Physical File Scanned + attached Dec 8, 2008 db
Application Status: COMPLETED
Permit Value: $80,000.00
Builder: VALLIERE CONSTRUCTION INC
Issued Date: June 26, 2007
File Close Date: September 23, 2008

Associated Properties

Address Zone More
4088 WELLESLEY AVENUE CS1 Property Report

Process Steps

Task Status
SANITARY CONNECTION

Pipe and connection must be visible for inspection.

PARTIAL
ROUGH IN PLUMBING

Rough in plumbing must be complete including potable water piping.

PARTIAL
ROUGH IN PLUMBING

Rough in plumbing must be complete including potable water piping.

FAILED
ROUGH IN PLUMBING

Rough in plumbing must be complete including potable water piping.

PARTIAL
ROUGH IN PLUMBING

Rough in plumbing must be complete including potable water piping.

PARTIAL
ROUGH IN PLUMBING

Rough in plumbing must be complete including potable water piping.

PASSED
FRAMING

Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval.

PARTIAL
FRAMING

Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval.

PASSED
MONITORING FIELD REVIEW

A building official may attend the site from time to time during the course of construction to ascertain that the field reviews are taking place and to monitor the field reviews undertaken by the registered professional.

PARTIAL
SPRINKLER FINAL-OLD

Sprinkler system must be complete and operating as intended.

PASSED
PLUMBING FINAL-OLD

All fixtures must be in place.

PARTIAL
PLUMBING FINAL-OLD

All fixtures must be in place.

PASSED
FINAL-OLD

Final approval as per requirements on plans.

PARTIAL
FINAL-OLD

Final approval as per requirements on plans.

PASSED

2008-09-23

Map
View in Google Earth (KML)


Disclaimer:

The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo. Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation. The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.

The Information Provided within this website is for Informational Purposes Only. It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.