BP111609 - 3168 Uplands Drive
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search Again| BP111609 - 3168 Uplands Drive | |
|---|---|
| Neighbourhood: | Rutherford |
| Street Address: | 3168 Uplands Drive |
| Type of Application: | Single / Two Family Alteration |
| File Number: | BP111609 |
| Date Application Submitted: | May 31, 2007 |
| Application Description: |
Construct a 12' x 15.5' two-storey bedroom / games room addition at rear of existing single family dwelling and ensuite. Revision submitted Oct. 12, 2007 1) Changing from 2"x10" to 2"x8" floor joists in games room. 2) Changing from 8" to 6" foundation walls. AG Revision submitted April 23, 2008 1) Adding 1 washbasin & 1 shower. |
| Application Status: | COMPLETED |
| Permit Value: | $39,145.26 |
| Building Area: |
34.37 M2 369.96 ft2 |
| Issued Date: | July 16, 2007 |
| File Close Date: | October 30, 2009 |
Associated Properties
| Address | Zone | More |
|---|---|---|
| 3168 UPLANDS DRIVE | R5 | Property Report |
Process Steps
| Task | Status |
|---|---|
|
MONITORING FIELD REVIEW
A building official may attend the site from time to time during the course of construction to ascertain that the field reviews are taking place and to monitor the field reviews undertaken by the registered professional. |
COMPLETED |
|
FOOTING/FORMS
Inspection of forms prior to any concrete being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. |
PASSED |
|
PERIMETER DRAIN
For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering. |
PASSED |
|
UNDERSLAB INSULATION
Inspection required prior to placing slab concrete. |
PASSED |
|
ROUGH IN PLUMBING
Rough In plumbing must be complete including water piping. |
PARTIAL |
|
ROUGH IN PLUMBING
Rough In plumbing must be complete including water piping. |
CANCELLED |
|
ROUGH IN PLUMBING
Rough In plumbing must be complete including water piping. |
CANCELLED |
|
ROUGH IN PLUMBING
Rough In plumbing must be complete including water piping. |
PARTIAL |
|
ROUGH IN PLUMBING
Rough In plumbing must be complete including water piping. |
PARTIAL |
|
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
PASSED |
|
FRAMING
Rough in plumbing & electrical must be complete. |
PASSED |
|
INSULATION
Insulation and vapour barrier to be complete prior to inspection |
PARTIAL |
|
FINAL-OLD
Final approval as per requirements on plans. |
FAILED |
|
FINAL-OLD
Final approval as per requirements on plans. |
PASSED
2009-10-30 |
| Map |
|---|
View in Google Earth (KML)
|
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.

View in Google Earth (KML)