BP111599 - 680 Trans Canada Highway --Drawings Attached

Interested in this application? Login to manage subscriptions to subscribe to updates!

Search Again
BP111599 - 680 Trans Canada Highway --Drawings Attached
Neighbourhood: Newcastle/Brechin    
Street Address: 680 Trans Canada Highway --Drawings Attached
Type of Application: Commercial / Multi / Industrial
File Number: BP111599
Date Application Submitted: May 29, 2007
Application Description: Departure Bay Ferry Terminal Expansion. Addition to the existing Bistro building that will contain ticketing and baggage area, service and retail area and the existing bistro. Considered one building by Code. Division A, Part 3 building, 3.2.2.26, one storey, building area ~3100m2 to be sprinklered throughout including the existing portion of the building. Group A Division 2, Combustible or non-combustible construction permitted. Installing fire alarm throughout, Service room containing fuel fired appliance and storage of combustible refuse /recycling to have 1 hour FRR/FS. One universal washroom to be provided in the Bistro area and will be under future permit.

Received Sprinkler drawings on October 15, 2007.
Fire suppression design and field review by Dr. N. Ardashirov, P.Eng. (B1,B2)
Application Status: COMPLETED
Permit Value: $9,300,000.00
Builder: BRITISH COLUMBIA FERRY SERVICES INC
Issued Date: March 17, 2008
File Close Date: March 18, 2010

Associated Properties

Address Zone More
680 TRANS-CANADA HWY PRC1 , W1 , W2 , W3 Property Report

Process Steps

Task Status
MONITORING FIELD REVIEW

A building official may attend the site from time to time during the course of construction to ascertain that the field reviews are taking place and to monitor the field reviews undertaken by the registered professional.

PARTIAL
MONITORING FIELD REVIEW

A building official may attend the site from time to time during the course of construction to ascertain that the field reviews are taking place and to monitor the field reviews undertaken by the registered professional.

PARTIAL
MONITORING FIELD REVIEW

A building official may attend the site from time to time during the course of construction to ascertain that the field reviews are taking place and to monitor the field reviews undertaken by the registered professional.

PARTIAL
MONITORING FIELD REVIEW

A building official may attend the site from time to time during the course of construction to ascertain that the field reviews are taking place and to monitor the field reviews undertaken by the registered professional.

PARTIAL
MONITORING FIELD REVIEW

A building official may attend the site from time to time during the course of construction to ascertain that the field reviews are taking place and to monitor the field reviews undertaken by the registered professional.

PARTIAL
SPRINKLER FINAL-OLD

Sprinkler system must be complete and operating as intended.

PASSED
PLUMBING FINAL-OLD

All fixtures must be in place.

PARTIAL
PLUMBING FINAL-OLD

All fixtures must be in place.

PASSED
OCCUPANCY-OLD PARTIAL
OCCUPANCY-OLD PARTIAL
OCCUPANCY-OLD PARTIAL
OCCUPANCY-OLD PASSED

2010-03-18

FINAL-OLD

Final approval as per requirements on plans.

CANCELLED
FINAL-OLD

Final approval as per requirements on plans.

PARTIAL
Map
View in Google Earth (KML)


Disclaimer:

The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo. Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation. The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.

The Information Provided within this website is for Informational Purposes Only. It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.