BP111475 - 4376 Boban - unit 1
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search Again| BP111475 - 4376 Boban - unit 1 | |
|---|---|
| Neighbourhood: | Pleasant Valley |
| Street Address: | 4376 Boban - unit 1 |
| Type of Application: | Leasehold Improvements |
| File Number: | BP111475 |
| Date Application Submitted: | May 02, 2007 |
| Application Description: |
EBA Engineering - Expanding into neighbouring unit 7 - 120.1 m2 and units 4 & 5 - 226.7 m2. Total area of suite now = 808.6m2, Group D. Work includes new interior office spaces, removal of overhead door and installation of window, new front entry, changing one existing washroom to kitchen area, changing one toilet to shower, and removal of existing janitor sink. All existing stairs to mezzanines built without permit must be removed. No changes to existing demising wall. One washroom must meet the requirements for a "universal" toilet room. 2,608.63m2 F-2 unsprinklered, combustible one storey building. non-conforming under the 2006 BC Building Code. Physical File Scanned + attached July 7, 2008 db |
| Application Status: | COMPLETED |
| Permit Value: | $195,000.00 |
| Builder: | TECTONICA MANAGEMENT INC |
| Issued Date: | July 04, 2007 |
| File Close Date: | April 11, 2008 |
Associated Properties
| Address | Zone | More |
|---|---|---|
| 4376 BOBAN DRIVE | I2 | Property Report |
Process Steps
| Task | Status |
|---|---|
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PASSED |
|
FRAMING
Rough in plumbing and electrical must be complete. Survey Certificate and Truss Layouts required for approval. |
PARTIAL |
|
FRAMING
Rough in plumbing and electrical must be complete. Survey Certificate and Truss Layouts required for approval. |
PARTIAL |
|
FRAMING
Rough in plumbing and electrical must be complete. Survey Certificate and Truss Layouts required for approval. |
PASSED |
|
PLUMBING FINAL-OLD
All fixtures must be in place. |
PARTIAL |
|
PLUMBING FINAL-OLD
All fixtures must be in place. |
PARTIAL |
|
PLUMBING FINAL-OLD
All fixtures must be in place. |
FAILED |
|
PLUMBING FINAL-OLD
All fixtures must be in place. |
PASSED |
|
FINAL-OLD
Final Approval as per requirements on plans. |
PARTIAL |
|
FINAL-OLD
Final Approval as per requirements on plans. |
PARTIAL |
|
FINAL-OLD
Final Approval as per requirements on plans. |
PASSED
2008-04-11 |
| Map |
|---|
View in Google Earth (KML)
|
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.

View in Google Earth (KML)