BP111380 - 3063 Neyland

Interested in this application? Login to manage subscriptions to subscribe to updates!

Search Again
BP111380 - 3063 Neyland
Neighbourhood: Departure Bay    
Street Address: 3063 Neyland
Type of Application: Single / Two Family Dwelling
File Number: BP111380
Date Application Submitted: April 05, 2007
Application Description: Construct a 24 x 30 ft two-storey workshop/kitchen/family room addition at rear and 12.5 x 37 ft. two-storey storage/mstr bdrm/ensuite addition at right side of existing single family dwelling.


May 4th, 2009 See events. TW

2009-MAY-25 Electronic file only. Folder contents scanned in attachments. mb
Application Status: COMPLETED
Permit Value: $217,021.70
Building Area: 221.07 M2
2,379.58 ft2
Issued Date: May 04, 2007
File Close Date: May 19, 2009

Associated Properties

Address Zone More
3063 NEYLAND ROAD R5 Property Report

Process Steps

Task Status
FOOTING / FORMS

Inspection of forms prior to any concrete being poured

CANCELLED
FOOTING / FORMS

Inspection of forms prior to any concrete being poured

PASSED
PERIMETER DRAIN

For perimeter drain , foundation walls should be damp proofed and drain tile in place with drain rock covering

PARTIAL
PERIMETER DRAIN

For perimeter drain , foundation walls should be damp proofed and drain tile in place with drain rock covering

CANCELLED
UNDERSLAB PLUMBING

Complete underslab plumbing must be visible

FAILED
UNDERSLAB PLUMBING

Complete underslab plumbing must be visible

PASSED
UNDERSLAB INSULATION

Inspection required prior to placing slab concrete

PASSED
SANITARY CONNECTION

Pipe and Connection must be visible for inspection

PARTIAL
SANITARY CONNECTION

Pipe and Connection must be visible for inspection

PASSED
ROUGH IN PLUMBING

Rough in plumbing must be complete including potable water piping

FAILED
ROUGH IN PLUMBING

Rough in plumbing must be complete including potable water piping

PARTIAL
ROUGH IN PLUMBING

Rough in plumbing must be complete including potable water piping

PARTIAL
ROUGH IN PLUMBING

Rough in plumbing must be complete including potable water piping

PASSED
PAPER/FLASHING/WATERPROOFING

When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco.

PASSED
FRAMING

Rough in plumbing and electrical must be complete. Survey Certificate & Truss Layouts required for approval

CANCELLED
FRAMING

Rough in plumbing and electrical must be complete. Survey Certificate & Truss Layouts required for approval

CANCELLED
FRAMING

Rough in plumbing and electrical must be complete. Survey Certificate & Truss Layouts required for approval

FAILED
FRAMING

Rough in plumbing and electrical must be complete. Survey Certificate & Truss Layouts required for approval

PASSED
INSULATION

Insulation and vapour barrier to be complete prior to inspection

PASSED
FINAL

Final approval as per requirements on plans.

FAILED
FINAL

Final approval as per requirements on plans.

PASSED

2009-05-19

Map
View in Google Earth (KML)


Disclaimer:

The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo. Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation. The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.