BP111345 - 210 - 1808 Bowen Road - upper floor
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search Again| BP111345 - 210 - 1808 Bowen Road - upper floor | |
|---|---|
| Neighbourhood: | Northfield |
| Street Address: | 210 - 1808 Bowen Road - upper floor |
| Type of Application: | Leasehold Improvements |
| File Number: | BP111345 |
| Date Application Submitted: | March 27, 2007 |
| Application Description: |
Dr. Alexis David Orthodontics - 143 m2 office suite. Work includes adding area above stairs for mechanical equipment (3/4 hr fire separation required); interior walls, washroom, sinks and sprinkler changes. Corridor is a required fire separation with no fire resistance rating. "Universal" washroom available in the corridor of the upper floor. 1404 m2 Office / Retail building, Part 3, combustible, sprinklered building Reclassified under 2006 BCBC 3.2.2.62. Group E and D. Floor 3/4 hr FRR/ FS, no roof rating required. |
| Application Status: | COMPLETED |
| Permit Value: | $85,000.00 |
| Builder: | MIKON CONSTRUCTION LTD |
| Issued Date: | April 30, 2007 |
| File Close Date: | September 11, 2007 |
Associated Properties
| Address | Zone | More |
|---|---|---|
| 1808 BOWEN ROAD | COR3 | Property Report |
Process Steps
| Task | Status |
|---|---|
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PARTIAL |
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
CANCELLED |
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PASSED |
|
FRAMING
Rough in plumbing and electrical must be complete. Survey Certificate and Truss Layouts required for approval. |
PASSED |
|
PLUMBING FINAL-OLD
All fixtures must be in place. |
PASSED |
|
SPRINKLER FINAL-OLD
Sprinkler system must be complete and operating as intended. |
PARTIAL |
|
SPRINKLER FINAL-OLD
Sprinkler system must be complete and operating as intended. |
PASSED |
|
FINAL-OLD
Final Approval as per requirements on plans. |
FAILED |
|
FINAL-OLD
Final Approval as per requirements on plans. |
CANCELLED |
|
FINAL-OLD
Final Approval as per requirements on plans. |
PASSED
2007-09-11 |
| Map |
|---|
View in Google Earth (KML)
|
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.

View in Google Earth (KML)