BP111296 - 2363 Cienar Drive

Interested in this application? Login to manage subscriptions to subscribe to updates!

Search Again
BP111296 - 2363 Cienar Drive
Neighbourhood: Diver Lake    
Street Address: 2363 Cienar Drive
Type of Application: Commercial / Multi / Industrial
File Number: BP111296
Date Application Submitted: March 09, 2007
Application Description: Addition to warehouse 25'.0' x 80'-0" = 2000 sq.ft. (185.8m2) to south side of north building. Two new washrooms in existing portion of building on main floor and relocating walls in the existing 45 min exit enclosure . existing 45min FRR for the floor assembly and second floor.
Group F Division 2. Unsprinklered, Two storeys, Part 3. Building classification 3.2.2.71 (780.36m2);
East wall face: 2hr FRR required, achieved by Spray foam, Cafco Blaze-Shield HP, ULC BXUVC.W801;
West wall face: 45min FRR required, achieved by Spray foam, Cafco Blaze-Shield HP, ULC BXUVC.W801;
2nd existing building (rear of site) 1 hr. FRR (existing) for north wall face.

Existing Warehouse main floor 445.92m2. Existing office 1600sq ft. (148.6m2). Total area of main floor = 8400 sq.ft. (780.36m2) including addition; upper floor office = 1600sq.ft. Total building floor area = 10000sq. ft. 929m2. unsprinklered.

Physical File Scanned + attached Aug 19, 2008 db
Application Status: COMPLETED
Permit Value: $65,292.38
Builder: F & M INSTALLATIONS LTD
Issued Date: April 13, 2007
File Close Date: July 04, 2007

Associated Properties

Address Zone More
2363 CIENAR DRIVE I2 Property Report

Process Steps

Task Status
FOOTING/FORMS

Inspection of forms prior to any cement being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite.

PASSED
PERIMETER DRAIN

For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering.

PASSED
UNDERSLAB PLUMBING

complete underslab plumbing must be visible.

FAILED
UNDERSLAB PLUMBING

complete underslab plumbing must be visible.

PASSED
ROUGH IN PLUMBING

Rough in plumbing must be complete including potable water piping.

FAILED
ROUGH IN PLUMBING

Rough in plumbing must be complete including potable water piping.

CANCELLED
ROUGH IN PLUMBING

Rough in plumbing must be complete including potable water piping.

PASSED
FRAMING

Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval.

PASSED
PLUMBING FINAL-OLD

All fixtures must be in place.

PARTIAL
PLUMBING FINAL-OLD

All fixtures must be in place.

PASSED
FINAL-OLD

Final approval as per requirements on plans.

FAILED
FINAL-OLD

Final approval as per requirements on plans.

PASSED

2007-07-04

Map
View in Google Earth (KML)


Disclaimer:

The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo. Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation. The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.