BP111269 - 572 Stewart
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search Again| BP111269 - 572 Stewart | |
|---|---|
| Neighbourhood: | Newcastle/Brechin |
| Street Address: | 572 Stewart |
| Type of Application: | Commercial / Multi-Res Alteration |
| File Number: | BP111269 |
| Date Application Submitted: | March 05, 2007 |
| Application Description: |
Channel View - fire damage restoration, work includes exterior and interior walls, suite fire separations, cooridors, plumbing, mechanical, sprinkler systems, electrical systems, structural, etc. Existing building - (by original (1993) Architects design considered 4 storey) combustible construction, sprinklered with fire alarm system, underground lower level of parking spanning multiple buildings, 1st floor - parking and social area, 2nd floor retail and office (434.4m2), 3rd & 4th floor (305m2 each) residential. 2006 Building Code review by GHL identified existing floor construction will meet the requirements of a five storey building, 2 hr FS existing between parking garage & commercial/residential, 2 hr between retail and residential, 1hr between residential floors. Physical File Scanned + attached Dec 17, 2008 db |
| Application Status: | COMPLETED |
| Permit Value: | $1,155,457.00 |
| Builder: | BELFOR (CANADA) INC |
| Issued Date: | October 02, 2007 |
| File Close Date: | July 28, 2008 |
Process Steps
| Task | Status |
|---|---|
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PARTIAL |
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PARTIAL |
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
FAILED |
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PARTIAL |
|
ROUGH IN SPRINKLER
Rough in sprinkler must be complete and visable for inspection. |
PARTIAL |
|
ROUGH IN SPRINKLER
Rough in sprinkler must be complete and visable for inspection. |
PARTIAL |
|
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
CANCELLED |
|
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PARTIAL |
|
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
FAILED |
|
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PARTIAL |
|
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PARTIAL |
|
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PARTIAL |
|
SPRINKLER FINAL-OLD
Sprinkler system must be complete and operating as intended. |
PARTIAL |
|
SPRINKLER FINAL-OLD
Sprinkler system must be complete and operating as intended. |
PASSED |
|
PLUMBING FINAL-OLD
All fixtures must be in place. |
PASSED |
|
FINAL-OLD
Final approval as per requirements on plans. |
FAILED |
|
FINAL-OLD
Final approval as per requirements on plans. |
PASSED
2008-07-28 |
| Map |
|---|
View in Google Earth (KML)
|
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.

View in Google Earth (KML)