BP111248 - 31 Pirates Lane -- Scanned
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search Again| BP111248 - 31 Pirates Lane -- Scanned | |
|---|---|
| Neighbourhood: | Protection Island |
| Street Address: | 31 Pirates Lane -- Scanned |
| Type of Application: | Single / Two Family Dwelling |
| File Number: | BP111248 |
| Date Application Submitted: | February 23, 2007 |
| Application Description: |
Construct a three storey single family dwelling (unfinished basement) on slab/crawlspace. Revision approved July 29, 2008 1) Adding footing along side stairs to eliminate eng. beams FB1, FB2 & FB4 2) Adding woodstove 3) Changing window sizes/locations 4) Cantilevering floor in living room 12" 5) Adding approx. 26'6" X 8' deck on left side AG Revised plans (Aug. 15, 2008) with revisions and foundation (signed and sealed by eng.) attached to file copy. AG |
| Application Status: | COMPLETED |
| Permit Value: | $178,673.70 |
| Building Area: |
147.77 M2 1,590.58 ft2 |
| Issued Date: | June 22, 2007 |
| File Close Date: | February 24, 2012 |
Associated Properties
| Address | Zone | More |
|---|---|---|
| 31 PIRATES LANE | R3 | Property Report |
Process Steps
| Task | Status |
|---|---|
|
FOOTING / FORMS
Inspection of forms prior to any concrete being poured |
PASSED |
|
PERIMETER DRAIN
For perimeter drain , foundation walls should be damp proofed and drain tile in place with drain rock covering |
PASSED |
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping |
PARTIAL |
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping |
PASSED |
|
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
PASSED |
|
FRAMING
Rough in plumbing and electrical must be complete. Survey Certificate & Truss Layouts required for approval |
FAILED |
|
FRAMING
Rough in plumbing and electrical must be complete. Survey Certificate & Truss Layouts required for approval |
PASSED |
|
INSULATION
Insulation and vapour barrier to be complete prior to inspection |
PASSED |
|
OCCUPANCY-OLD
Exterior of house must be complete including stairs, decks, handrails, porches and exterior finish |
PASSED
2014-05-12 |
| Map |
|---|
View in Google Earth (KML)
|
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.

View in Google Earth (KML)