BP111242 - 535 Franklyn Street changed to 555 Franklyn

Interested in this application? Login to manage subscriptions to subscribe to updates!

Search Again
BP111242 - 535 Franklyn Street changed to 555 Franklyn
Neighbourhood: Downtown/Old City    
Street Address: 535 Franklyn Street changed to 555 Franklyn
Type of Application: Commercial / Multi / Industrial
File Number: BP111242
Date Application Submitted: February 23, 2007
Application Description: Vivo Gallery Residences - 60 residential units, 5 mixed use retail or office.
1,520m2 non-combustible four storey bldg with 2005m2 below grade storage garage/tenant storage area. 1hr FS/FRR btwn res. suites, 1.5hr FS/FRR btwn storage garage & other occupancies, 2hr FS/FRR btwn retail & residential. Alternative solutions by Murray Johnson Eng. Ltd. for exit exposure, exiting from 2 storey suites, openings on the property line & combustible piping penetration clarification. Foundation & on-site servicing under BP111304.
Bldg Classification:3.2.2.45 Group C & 3.2.2.58., Group E, < 1800m2, 4 storey, sprinklered with fire alarm,1 hr FS/FRR for all floors & mezzanines, 1 hr FRR for supports.
Address change to 555 Franklyn, plumbing added to unit 119 & 320, metal trellis on top floor changed to heavy timber, elevator rooms relocated, future C/O permits required for units 116 - 119 & 320 Dec. 1,08 VS
Doreen has file Dec 11, 2008
Landscape drawings scanned + attached Mar 3, 2009 db

Application Status: COMPLETED
Permit Value: $8,400,000.00
Builder: ALTERRA PROPERTY GROUP LTD
Issued Date: December 06, 2007
File Close Date: December 09, 2008

Process Steps

Task Status
SANITARY CONNECTION

Pipe and connection must be visible for inspection.

PARTIAL
ROUGH IN PLUMBING

Rough in plumbing must be complete including potable water piping.

PARTIAL
ROUGH IN PLUMBING

Rough in plumbing must be complete including potable water piping.

PARTIAL
ROUGH IN PLUMBING

Rough in plumbing must be complete including potable water piping.

PARTIAL
ROUGH IN PLUMBING

Rough in plumbing must be complete including potable water piping.

PARTIAL
ROUGH IN PLUMBING

Rough in plumbing must be complete including potable water piping.

PARTIAL
ROUGH IN PLUMBING

Rough in plumbing must be complete including potable water piping.

PARTIAL
ROUGH IN PLUMBING

Rough in plumbing must be complete including potable water piping.

CANCELLED
ROUGH IN PLUMBING

Rough in plumbing must be complete including potable water piping.

PARTIAL
ROUGH IN PLUMBING

Rough in plumbing must be complete including potable water piping.

PARTIAL
ROUGH IN PLUMBING

Rough in plumbing must be complete including potable water piping.

CANCELLED
ROUGH IN PLUMBING

Rough in plumbing must be complete including potable water piping.

PASSED
ROUGH IN SPRINKLER

Rough in sprinkler must be complete and visable for inspection.

PARTIAL
ROUGH IN SPRINKLER

Rough in sprinkler must be complete and visable for inspection.

PARTIAL
ROUGH IN SPRINKLER

Rough in sprinkler must be complete and visable for inspection.

PARTIAL
ROUGH IN SPRINKLER

Rough in sprinkler must be complete and visable for inspection.

PARTIAL
ROUGH IN SPRINKLER

Rough in sprinkler must be complete and visable for inspection.

PARTIAL
FRAMING

Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval.

CANCELLED
FRAMING

Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval.

PARTIAL
FRAMING

Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval.

CANCELLED
FRAMING

Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval.

PARTIAL
INSULATION

Insulation and vapour barrier to be complete prior to inspection.

PARTIAL
INSULATION

Insulation and vapour barrier to be complete prior to inspection.

PARTIAL
MONITORING FIELD REVIEW

A building official may attend the site from time to time during the course of construction to ascertain that the field reviews are taking place and to monitor the field reviews undertaken by the registered professional.

PARTIAL
MONITORING FIELD REVIEW

A building official may attend the site from time to time during the course of construction to ascertain that the field reviews are taking place and to monitor the field reviews undertaken by the registered professional.

PARTIAL
MONITORING FIELD REVIEW

A building official may attend the site from time to time during the course of construction to ascertain that the field reviews are taking place and to monitor the field reviews undertaken by the registered professional.

PARTIAL
OCCUPANCY-OLD PASSED

2008-12-09

Map
View in Google Earth (KML)


Disclaimer:

The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo. Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation. The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.

The Information Provided within this website is for Informational Purposes Only. It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.