BP111241 - 337 Ninth -- 345 Ninth (Alias)
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search Again| BP111241 - 337 Ninth -- 345 Ninth (Alias) | |
|---|---|
| Neighbourhood: | Harewood |
| Street Address: | 337 Ninth -- 345 Ninth (Alias) |
| Type of Application: | Single / Two Family Dwelling |
| File Number: | BP111241 |
| Date Application Submitted: | February 22, 2007 |
| Application Description: |
Construction a one storey single family dwelling with attached garage on a crawlspace, as well as a detached garage (second dwelling on the parent parcel) Revision July 13/2007 B1-B2 recieved from Geotech. 2009-Apr-02 - BP renewed - first inspection to be called by 2009-Oct-05, no more than one year between inspections after first inspection. Bp to be completed by 2011-Apr-04 |
| Application Status: | RETIRED |
| Permit Value: | $238,570.49 |
| Building Area: |
130.53 M2 1,405.01 ft2 |
| Issued Date: | April 04, 2007 |
| File Close Date: | November 18, 2010 |
Associated Properties
| Address | Zone | More |
|---|---|---|
| 345 NINTH STREET | R5 | Property Report |
Process Steps
| Task | Status |
|---|---|
|
FOOTING / FORMS
Inspection of forms prior to any concrete being poured |
FAILED |
|
FOOTING / FORMS
Inspection of forms prior to any concrete being poured |
PASSED |
|
PERIMETER DRAIN
For perimeter drain , foundation walls should be damp proofed and drain tile in place with drain rock covering |
PARTIAL |
|
UNDERSLAB PLUMBING
Complete underslab plumbing must be visible |
PASSED |
|
STORM CONNECTION
Pipe and Connection must be visible for inspection |
PASSED |
|
SANITARY CONNECTION
Pipe and Connection must be visible for inspection |
FAILED |
|
SANITARY CONNECTION
Pipe and Connection must be visible for inspection |
PASSED |
|
WATER CONNECTION
Pipe and Connection must be visable for inspection |
PASSED |
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping |
PARTIAL |
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping |
PASSED |
|
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
FAILED |
|
FRAMING
Rough in plumbing and electrical must be complete. Survey Certificate & Truss Layouts required for approval |
CANCELLED |
|
FRAMING
Rough in plumbing and electrical must be complete. Survey Certificate & Truss Layouts required for approval |
CANCELLED |
|
FRAMING
Rough in plumbing and electrical must be complete. Survey Certificate & Truss Layouts required for approval |
CANCELLED |
|
FRAMING
Rough in plumbing and electrical must be complete. Survey Certificate & Truss Layouts required for approval |
PASSED |
| Map |
|---|
View in Google Earth (KML)
|
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.

View in Google Earth (KML)