BP111241 - 337 Ninth -- 345 Ninth (Alias)
Neighbourhood: Harewood    
Street Address: 337 Ninth -- 345 Ninth (Alias)
Type of Application: Single / Two Family Dwelling
File Number: BP111241
Date Application Submitted: February 22, 2007
Application Description: Construction a one storey single family dwelling with attached garage on a crawlspace, as well as a detached garage (second dwelling on the parent parcel)
Revision July 13/2007
B1-B2 recieved from Geotech.

2009-Apr-02 - BP renewed - first inspection to be called by 2009-Oct-05, no more than one year between inspections after first inspection. Bp to be completed by 2011-Apr-04
Application Status: RETIRED
Permit Value: $238,570.49
Building Area: 130.53 M2
1,405.01 ft2
Issued Date: April 04, 2007
File Close Date: November 18, 2010

Associated Properties

Address Zone More
345 NINTH STREET R5 Property Report

Process Steps

Task Status
FOOTING / FORMS

Inspection of forms prior to any concrete being poured

FAILED
FOOTING / FORMS

Inspection of forms prior to any concrete being poured

PASSED
PERIMETER DRAIN

For perimeter drain , foundation walls should be damp proofed and drain tile in place with drain rock covering

PARTIAL
UNDERSLAB PLUMBING

Complete underslab plumbing must be visible

PASSED
STORM CONNECTION

Pipe and Connection must be visible for inspection

PASSED
SANITARY CONNECTION

Pipe and Connection must be visible for inspection

FAILED
SANITARY CONNECTION

Pipe and Connection must be visible for inspection

PASSED
WATER CONNECTION

Pipe and Connection must be visable for inspection

PASSED
ROUGH IN PLUMBING

Rough in plumbing must be complete including potable water piping

PARTIAL
ROUGH IN PLUMBING

Rough in plumbing must be complete including potable water piping

PASSED
PAPER/FLASHING/WATERPROOFING

When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco.

FAILED
FRAMING

Rough in plumbing and electrical must be complete. Survey Certificate & Truss Layouts required for approval

CANCELLED
FRAMING

Rough in plumbing and electrical must be complete. Survey Certificate & Truss Layouts required for approval

CANCELLED
FRAMING

Rough in plumbing and electrical must be complete. Survey Certificate & Truss Layouts required for approval

CANCELLED
FRAMING

Rough in plumbing and electrical must be complete. Survey Certificate & Truss Layouts required for approval

PASSED
Map
View in Google Earth (KML)


Disclaimer:

The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo. Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation. The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.

The Information Provided within this website is for Informational Purposes Only. It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.