BP111115 - 2243 Ashlee - changed from 2241 Ashlee Jul. 11,08
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search Again| BP111115 - 2243 Ashlee - changed from 2241 Ashlee Jul. 11,08 | |
|---|---|
| Neighbourhood: | Westwood |
| Street Address: | 2243 Ashlee - changed from 2241 Ashlee Jul. 11,08 |
| Type of Application: | Locate Permit |
| File Number: | BP111115 |
| Date Application Submitted: | January 03, 2007 |
| Application Description: |
Relocate existing SFD on new foundation (same lot). Existing SFD originally built under RDN permit #1906 in 1972. Revision Approved April 20, 2007: 1) RI plumbing reconfigured in Basement (Autowasher / RI bar sink added) 2) French doors added to North Elevation DT Revision submitted Sept. 21, 2007 1) Moving hwt location. 2) Roughing in walls (three bedrooms). AG |
| Application Status: | COMPLETED |
| Permit Value: | $44,414.00 |
| Issued Date: | February 21, 2007 |
| File Close Date: | May 05, 2008 |
Associated Properties
| Address | Zone | More |
|---|---|---|
| 2243 ASHLEE ROAD | R5 | Property Report |
Process Steps
| Task | Status |
|---|---|
|
EXCAVATION
Excavation of soil, prior to placing forms. |
FAILED |
|
FOOTING/FORMS
Inspection of Forms prior to any cement being poured. For Footing inspection, forms must be complete and approved plans (complete with City Stamp) must be onsite. |
CANCELLED |
|
FOOTING/FORMS
Inspection of Forms prior to any cement being poured. For Footing inspection, forms must be complete and approved plans (complete with City Stamp) must be onsite. |
PASSED |
|
PERIMETER DRAIN
For Perimeter Drain, foundation walls should be damp proofed and drain tile in place with drain rock covering. |
PASSED |
|
UNDERSLAB PLUMBING
Complete underslab plumbing must be visible. |
FAILED |
|
UNDERSLAB PLUMBING
Complete underslab plumbing must be visible. |
PASSED |
|
STORM CONNECTION
Pipe connection must be visible for inspection. |
CANCELLED |
|
STORM CONNECTION
Pipe connection must be visible for inspection. |
PASSED |
|
SANITARY CONNECTION
Pipe Connection must be visible for inspection. |
CANCELLED |
|
SANITARY CONNECTION
Pipe Connection must be visible for inspection. |
PASSED |
|
WATER CONNECTION
Pipe Connection must be visible for inspection. |
CANCELLED |
|
WATER CONNECTION
Pipe Connection must be visible for inspection. |
PASSED |
|
FRAMING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
PARTIAL |
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
FAILED |
|
FRAMING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
PASSED |
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PARTIAL |
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PARTIAL |
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PASSED |
|
LATERAL BRACING & SHEATHING
All nailing and blocking associated with braced wall panels to be completed for this inspection. Wood-based interior braced wall panels to be sheathed. Exterior braced wall panel locations to be clearly marked out on the interior and exterior. Interior braced wall panels to be clearly marked so their location can be seen now and later at the time of INTERIOR BRACED WALL PANEL INSPECTION. Additional anchor bolts shall be installed two per braced wall panel where a building contains framed walls supporting more than two floors. |
CANCELLED |
|
LATERAL BRACING & SHEATHING
All nailing and blocking associated with braced wall panels to be completed for this inspection. Wood-based interior braced wall panels to be sheathed. Exterior braced wall panel locations to be clearly marked out on the interior and exterior. Interior braced wall panels to be clearly marked so their location can be seen now and later at the time of INTERIOR BRACED WALL PANEL INSPECTION. Additional anchor bolts shall be installed two per braced wall panel where a building contains framed walls supporting more than two floors. |
PASSED |
|
INTERIOR BRACED WALL PANELS
The location of interior braced wall panels to be clearly indicated. This inspection is to take place prior to the installation of tape and joint compound. |
PASSED |
|
OCCUPANCY-OLD
Exterior of house must be complete including stairs, decks, handrails, porches and exterior finish |
PASSED
2008-05-05 |
| Map |
|---|
View in Google Earth (KML)
|
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.

View in Google Earth (KML)