BP111071 - 5199 Dunster (parent) Phase 3 Future 5191 Dunster Road SL13 VIS6075

Interested in this application? Login to manage subscriptions to subscribe to updates!

Search Again
BP111071 - 5199 Dunster (parent) Phase 3 Future 5191 Dunster Road SL13 VIS6075
Neighbourhood: Pleasant Valley    
Street Address: 5199 Dunster (parent) Phase 3 Future 5191 Dunster Road SL13 VIS6075
Type of Application: Commercial / Multi / Industrial
File Number: BP111071
Date Application Submitted: December 13, 2006
Application Description: Branen Villa - Multi family development - Phase 3 - INSPECTION TASKS ONLY for 5191 Dunster Road - Unit 3 - 127.88m2, garage 38.5m2

Physical File Scanned + attached Nov 4, 2008 db
Application Status: COMPLETED
Builder: DOMUS CONSTRUCTION & LAND DEVELOPMENT CORP
Issued Date: November 02, 2007
File Close Date: June 25, 2008

Associated Properties

Address Zone More
5200 DUNSTER ROAD R8 Property Report
5191 DUNSTER ROAD R8 Property Report

Process Steps

Task Status
FOOTING/FORMS

Inspection of forms prior to any cement being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite.

PASSED
PERIMETER DRAIN

For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering.

PASSED
STORM CONNECTION

Pipe and connection must be visible for inspection.

PASSED
SANITARY CONNECTION

Pipe and connection must be visible for inspection.

PASSED
WATER CONNECTION

Pipe and connection must be visible for inspection.

PASSED
ROUGH IN PLUMBING

Rough in plumbing must be complete including potable water piping.

PARTIAL
ROUGH IN PLUMBING

Rough in plumbing must be complete including potable water piping.

PASSED
ROUGH IN SPRINKLER

Rough in sprinkler must be complete and visable for inspection.

PARTIAL
ROUGH IN SPRINKLER

Rough in sprinkler must be complete and visable for inspection.

PASSED
FRAMING

Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval.

PASSED
INSULATION

Insulation and vapour barrier to be complete prior to inspection.

FAILED
INSULATION

Insulation and vapour barrier to be complete prior to inspection.

PASSED
SPRINKLER FINAL-OLD

Sprinkler system must be complete and operating as intended.

PARTIAL
SPRINKLER FINAL-OLD

Sprinkler system must be complete and operating as intended.

PASSED
OCCUPANCY-OLD FAILED
OCCUPANCY-OLD PASSED

2008-06-25

OCCUPANCY-OLD CANCELLED
Map
View in Google Earth (KML)


Disclaimer:

The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo. Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation. The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.