BP111069 - 5199 Dunster (parent) Phase 3 Units 1-6, SL 11-15, VIS6075 & 5199 Dunster SL15 VIS6075

Interested in this application? Login to manage subscriptions to subscribe to updates!

Search Again
BP111069 - 5199 Dunster (parent) Phase 3 Units 1-6, SL 11-15, VIS6075 & 5199 Dunster SL15 VIS6075
Neighbourhood: Pleasant Valley    
Street Address: 5199 Dunster (parent) Phase 3 Units 1-6, SL 11-15, VIS6075 & 5199 Dunster SL15 VIS6075
Type of Application: Commercial / Multi / Industrial
File Number: BP111069
Date Application Submitted: December 13, 2006
Application Description: Branen Villa - Multi family development - Phase 3 - units 1 to 5 of 15 single family houses and clubhouse completed in 3 phases. One storey, sprinklered, single family dwellings on crawl space with attached unsprinklered garages. On-site servicing under BP109679.

5199 Dunster Road - Unit 1 - 126.9m2, garage 39m2, inspection tasks under this permit. BP111069
5195 Dunster Road - Unit 2 - 127.88m2, garage 38.5m2, inspection tasks under BP111070.
5191 Dunster Road - Unit 3 - 127.88m2, garage 38.5m2, inspection tasks under BP111071.
5187 Dunster Road - Unit 4 - 129.36m2, garage 38.5m2, inspection tasks under BP111072.
5183 Dunster Road - Unit 5 - 122m2, garage 38.5m2, inspection tasks under BP111073.
Physical File Scanned + attached Nov 4, 2008 db

Application Status: COMPLETED
Permit Value: $810,400.00
Builder: DOMUS CONSTRUCTION & LAND DEVELOPMENT CORP
Issued Date: November 02, 2007
File Close Date: July 16, 2008

Associated Properties

Address Zone More
5187 DUNSTER ROAD R8 Property Report
5191 DUNSTER ROAD R8 Property Report
5195 DUNSTER ROAD R8 Property Report
5199 DUNSTER ROAD R8 Property Report
5200 DUNSTER ROAD R8 Property Report
5183 DUNSTER ROAD R8 Property Report

Process Steps

Task Status
FOOTING/FORMS

Inspection of forms prior to any cement being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite.

PASSED
PERIMETER DRAIN

For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering.

PASSED
STORM CONNECTION

Pipe and connection must be visible for inspection.

PASSED
SANITARY CONNECTION

Pipe and connection must be visible for inspection.

PASSED
WATER CONNECTION

Pipe and connection must be visible for inspection.

PASSED
ROUGH IN PLUMBING

Rough in plumbing must be complete including potable water piping.

PARTIAL
ROUGH IN PLUMBING

Rough in plumbing must be complete including potable water piping.

PASSED
ROUGH IN PLUMBING

Rough in plumbing must be complete including potable water piping.

PASSED
ROUGH IN SPRINKLER

Rough in sprinkler must be complete and visable for inspection.

PASSED
FRAMING

Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval.

PASSED
FRAMING

Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval.

PASSED
INSULATION

Insulation and vapour barrier to be complete prior to inspection.

PASSED
SPRINKLER FINAL-OLD

Sprinkler system must be complete and operating as intended.

PARTIAL
SPRINKLER FINAL-OLD

Sprinkler system must be complete and operating as intended.

PARTIAL
OCCUPANCY-OLD FAILED
OCCUPANCY-OLD FAILED
OCCUPANCY-OLD PASSED

2008-07-16

Map
View in Google Earth (KML)


Disclaimer:

The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo. Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation. The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.