BP111057 - 189 Cilaire

Interested in this application? Login to manage subscriptions to subscribe to updates!

Search Again
BP111057 - 189 Cilaire
Neighbourhood: Departure Bay    
Street Address: 189 Cilaire
Type of Application: Single / Two Family Dwelling
File Number: BP111057
Date Application Submitted: December 14, 2006
Application Description: Construct a two storey single family dwelling on a slab (located in the North Slope Study area).

Sanitary Service Fees of $1780 + $20 for new service added after existing service found to siamese into service for 191 Cilaire. No Permit found allowing siamesed sanitary service. July 3, 2007 GT

Revision submitted May 20, 2008
Adding three windows and changing door location on right side elevation. AG

Application Status: COMPLETED
Permit Value: $500,000.00
Building Area: 374.40 M2
4,030.00 ft2
Builder: DOVER BAY CONSTRUCTION LTD
Issued Date: April 25, 2007
File Close Date: July 30, 2008

Associated Properties

Address Zone More
189 CILAIRE DRIVE R1 Property Report

Process Steps

Task Status
COVENANT PREPARATION

type covenant, applicant to sign, city to notorize. Completed means that the covenant is ready to send to LTO. Completed status will create the task to track LTO registation

COMPLETED
COVENANT REGISTRATION

In progress = sent to LTO, Complete = Verification received. Upon receipt of Verification - go to property tab, comments. Enter the category DSD-Covenants, enter a description - date of registration, and what the covenant is for.

COMPLETED
FOOTING / FORMS

Inspection of forms prior to any concrete being poured

PARTIAL
FOOTING / FORMS

Inspection of forms prior to any concrete being poured

PASSED
PERIMETER DRAIN

For perimeter drain , foundation walls should be damp proofed and drain tile in place with drain rock covering

PASSED
UNDERSLAB PLUMBING

Complete underslab plumbing must be visible

PASSED
STORM CONNECTION

Pipe and Connection must be visible for inspection

PASSED
SANITARY CONNECTION

Pipe and Connection must be visible for inspection

PASSED
WATER CONNECTION

Pipe and Connection must be visable for inspection

PASSED
ROUGH IN PLUMBING

Rough in plumbing must be complete including potable water piping

PARTIAL
ROUGH IN PLUMBING

Rough in plumbing must be complete including potable water piping

PARTIAL
ROUGH IN PLUMBING

Rough in plumbing must be complete including potable water piping

PASSED
PAPER/FLASHING/WATERPROOFING

When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco.

PASSED
FRAMING

Rough in plumbing and electrical must be complete. Survey Certificate & Truss Layouts required for approval

FAILED
INSULATION

Insulation and vapour barrier to be complete prior to inspection

PASSED
OCCUPANCY-OLD

Exterior of house must be complete including stairs, decks, handrails, porches and exterior finish

FAILED
OCCUPANCY-OLD

Exterior of house must be complete including stairs, decks, handrails, porches and exterior finish

FAILED
OCCUPANCY-OLD

Exterior of house must be complete including stairs, decks, handrails, porches and exterior finish

PASSED

2008-07-31

Map
View in Google Earth (KML)


Disclaimer:

The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo. Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation. The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.