BP111008 - 4960 Vista View (Parent) Bldg B - 4966 & 4970 Vista View

Interested in this application? Login to manage subscriptions to subscribe to updates!

Search Again
BP111008 - 4960 Vista View (Parent) Bldg B - 4966 & 4970 Vista View
Neighbourhood: North Slope    
Street Address: 4960 Vista View (Parent) Bldg B - 4966 & 4970 Vista View
Type of Application: Commercial / Multi / Industrial
File Number: BP111008
Date Application Submitted: July 19, 2006
Application Description: Vista View 4 building Townhouse complex - This permit is for INSPECTION TASKS ONLY for Unit B, all other information is held in BP110473. Cross reference BP110611 for foundations.

Unit B1-4970 Vista View, 220.7m2 gross floor area, 49.4m2 garage
Unit B2-4966 Vista View, 206.9m2 gross floor area, 43.5m2 garage

Physical File Scanned + attached Jan 19, 2009 db
Application Status: COMPLETED
Builder: ONE TREE DEVELOPMENTS
Issued Date: June 05, 2007
File Close Date: May 14, 2008

Associated Properties

Address Zone More
4970 VISTA VIEW CRESCENT R6 Property Report
4966 VISTA VIEW CRESCENT R6 Property Report
4960 VISTA VIEW CRESCENT R6 Property Report

Process Steps

Task Status
PERIMETER DRAIN

For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering.

PASSED
ROUGH IN PLUMBING

Rough in plumbing must be complete including potable water piping.

PARTIAL
ROUGH IN PLUMBING

Rough in plumbing must be complete including potable water piping.

PARTIAL
ROUGH IN PLUMBING

Rough in plumbing must be complete including potable water piping.

PARTIAL
ROUGH IN PLUMBING

Rough in plumbing must be complete including potable water piping.

PARTIAL
ROUGH IN PLUMBING

Rough in plumbing must be complete including potable water piping.

PARTIAL
ROUGH IN PLUMBING

Rough in plumbing must be complete including potable water piping.

PASSED
PAPER/FLASHING/WATERPROOFING

When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco.

PASSED
ROUGH IN SPRINKLER

Rough in sprinkler must be complete and visable for inspection.

PARTIAL
ROUGH IN SPRINKLER

Rough in sprinkler must be complete and visable for inspection.

PASSED
FRAMING

Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval.

PASSED
FRAMING

Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval.

CANCELLED
FRAMING

Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval.

PASSED
INSULATION

Insulation and vapour barrier to be complete prior to inspection.

PARTIAL
INSULATION

Insulation and vapour barrier to be complete prior to inspection.

PARTIAL
INSULATION

Insulation and vapour barrier to be complete prior to inspection.

PARTIAL
SPRINKLER FINAL-OLD

Sprinkler system must be complete and operating as intended.

PASSED
OCCUPANCY-OLD CANCELLED
OCCUPANCY-OLD FAILED
OCCUPANCY-OLD PARTIAL
OCCUPANCY-OLD FAILED
OCCUPANCY-OLD PASSED

2008-05-14

Map
View in Google Earth (KML)


Disclaimer:

The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo. Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation. The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.

The Information Provided within this website is for Informational Purposes Only. It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.