BP110878 - 6000 Oliver Road - Drawings Scanned Attached

Interested in this application? Login to manage subscriptions to subscribe to updates!

Search Again
BP110878 - 6000 Oliver Road - Drawings Scanned Attached
Neighbourhood: Rutherford    
Street Address: 6000 Oliver Road - Drawings Scanned Attached
Type of Application: Commercial / Multi / Industrial
File Number: BP110878
Date Application Submitted: November 08, 2006
Application Description: Community Recreation Centre- X reference BP11894 for site servicing.
Group A2, building classification 3.2.2.24, non-combustible construction 2 storeys, sprinklered, and fire alarm system. Building area 2509m2, 2nd=658m2, 1-hour floor assembly FRR/FS and loading bearing supports, Police offices Group D, with 1 hr FRR/FS, exit shafts 1 hr FRR/FS service rooms 1 hour FRR/FS, elevator shafts and machine room 1 hour FRR/FS, Service shaft 3/4hour FRR/FS, panic hardware and access for person with disabilities provided, power operated door at front entrance Interconnected floor in compliance with 1998 BCBC sentence 3.2.8.2.(6). Floor openings in the 2nd floor will be provided with protection in accordance with NFPA 13-1999 (Sprinklers). Main flr,Occupant Load = 559; (the breakdown per room is Gym =272, Children's care = 36, Multi 1 = 80; Multi 2 = 95, 2nd flr OL= 356, the breakdown per room is for the Wellness 1& 2 = 286; When folding walls are used max 60 persons for one egress door
Application Status: COMPLETED
Permit Value: $6,200,000.00
Builder: TASK CONSTRUCTION MANAGEMENT INC
Issued Date: January 25, 2007
File Close Date: February 15, 2008

Process Steps

Task Status
FIRELINE

Fireline for the sprinkler system must be complete and visable for inspection.

PARTIAL
FIRELINE

Fireline for the sprinkler system must be complete and visable for inspection.

PARTIAL
UNDERSLAB PLUMBING

complete underslab plumbing must be visible.

PARTIAL
UNDERSLAB PLUMBING

complete underslab plumbing must be visible.

PASSED
UNDERSLAB PLUMBING

complete underslab plumbing must be visible.

CANCELLED
ROUGH IN PLUMBING

Rough in plumbing must be complete including potable water piping.

PASSED
MONITORING FIELD REVIEW

A building official may attend the site from time to time during the course of construction to ascertain that the field reviews are taking place and to monitor the field reviews undertaken by the registered professional.

PARTIAL
MONITORING FIELD REVIEW

A building official may attend the site from time to time during the course of construction to ascertain that the field reviews are taking place and to monitor the field reviews undertaken by the registered professional.

PARTIAL
SPRINKLER FINAL-OLD

Sprinkler system must be complete and operating as intended.

PASSED
PLUMBING FINAL-OLD

All fixtures must be in place.

PASSED
OCCUPANCY-OLD FAILED
OCCUPANCY-OLD PARTIAL
OCCUPANCY-OLD PASSED

2008-02-15

Map
View in Google Earth (KML)


Disclaimer:

The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo. Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation. The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.

The Information Provided within this website is for Informational Purposes Only. It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.