BP110850 - 1940 Island Diesel -- Drawings Scanned/Attached
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search Again| BP110850 - 1940 Island Diesel -- Drawings Scanned/Attached | |
|---|---|
| Neighbourhood: | Northfield |
| Street Address: | 1940 Island Diesel -- Drawings Scanned/Attached |
| Type of Application: | Commercial / Multi / Industrial |
| File Number: | BP110850 |
| Date Application Submitted: | November 01, 2006 |
| Application Description: |
Torbram Electric - New 426.6 m2 two storey pre-fabricated steel warehouse building with 151.8m2 on second floor, sprinklered with fire alarm system. 3/4 hr fire separation required for floor, wall and structural supports of second storey. 3/4 hr fire separation required at walls and washroom ceiling to separate main floor office area to reduce spatial separation requirements for north wall face, as per Equivalency. Water curtain Equivalency for south and east 2 hr FRR spatial separation requirements. Two washrooms, one of which is "accessible". Part 9 building, 426.6m2, two storey, combustible construction, sprinklered with fire alarm. April 19, 2007 Revised drawings approved, small mezzanine landing added, windows between 2nd floor and warehouse removed. VS |
| Application Status: | HOLDBACK |
| Permit Value: | $300,000.00 |
| Builder: | ZENCON CONSTRUCTION |
| Issued Date: | January 03, 2007 |
| File Close Date: | September 26, 2007 |
Associated Properties
| Address | Zone | More |
|---|---|---|
| 1940 ISLAND DIESEL WAY | I3 | Property Report |
Process Steps
| Task | Status |
|---|---|
|
FOOTING/FORMS
Inspection of forms prior to any cement being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. |
PASSED |
|
PERIMETER DRAIN
For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering. |
PASSED |
|
FIRELINE
Fireline for the sprinkler system must be complete and visable for inspection. |
FAILED |
|
FIRELINE
Fireline for the sprinkler system must be complete and visable for inspection. |
PARTIAL |
|
UNDERSLAB PLUMBING
complete underslab plumbing must be visible. |
FAILED |
|
UNDERSLAB PLUMBING
complete underslab plumbing must be visible. |
PASSED |
|
STORM CONNECTION
Pipe and connection must be visible for inspection. |
PARTIAL |
|
STORM CONNECTION
Pipe and connection must be visible for inspection. |
FAILED |
|
STORM CONNECTION
Pipe and connection must be visible for inspection. |
PASSED |
|
SANITARY CONNECTION
Pipe and connection must be visible for inspection. |
PARTIAL |
|
SANITARY CONNECTION
Pipe and connection must be visible for inspection. |
FAILED |
|
SANITARY CONNECTION
Pipe and connection must be visible for inspection. |
PASSED |
|
WATER CONNECTION
Pipe and connection must be visible for inspection. |
PARTIAL |
|
WATER CONNECTION
Pipe and connection must be visible for inspection. |
FAILED |
|
WATER CONNECTION
Pipe and connection must be visible for inspection. |
PASSED |
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
CANCELLED |
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
CANCELLED |
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PARTIAL |
|
ROUGH IN SPRINKLER
Rough in sprinkler must be complete and visable for inspection. |
PARTIAL |
|
ROUGH IN SPRINKLER
Rough in sprinkler must be complete and visable for inspection. |
PASSED |
|
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
FAILED |
|
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
CANCELLED |
|
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PASSED |
|
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PARTIAL |
|
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PASSED |
|
SPRINKLER FINAL-OLD
Sprinkler system must be complete and operating as intended. |
PARTIAL |
|
PLUMBING FINAL-OLD
All fixtures must be in place. |
FAILED |
| OCCUPANCY-OLD | FAILED |
| OCCUPANCY-OLD | FAILED |
| OCCUPANCY-OLD |
PASSED
2007-09-26 |
| Map |
|---|
View in Google Earth (KML)
|
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.

View in Google Earth (KML)