BP110623 - #2 5779 Turner -- Drawings Scanned/Attached
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search Again| BP110623 - #2 5779 Turner -- Drawings Scanned/Attached | |
|---|---|
| Neighbourhood: | Rutherford |
| Street Address: | #2 5779 Turner -- Drawings Scanned/Attached |
| Type of Application: | Commercial / Multi-Res Alteration |
| File Number: | BP110623 |
| Date Application Submitted: | August 29, 2006 |
| Application Description: |
Existing Boston Pizza 452m2 with 156m2 mezzanine with 3/4 hr FRR floor. Work includes relocation of one plumbing fixture, addition of hand & waste sink at bar, interior millwork and reconfiguration of interior partitions, 8 additional or moved sprinkler heads, replace some railing with partial wall at mezzanine - now considered interconnected second floor. Occupant load 260 patrons, 60 maximum on second floor and 200 on main. Building Reclassified under BCBC1998 as 3.2.2.26 A-2, 2 storey, combustible or non-combustible, max 2400m2, sprinklered with fire alarm. Flloor assemblies, mezzanines, and supports require 3/4 hr FRR if of combustible construction . Building is 790m2, with two tenant spaces with existing 1 hr FRR/FS demising wall. Revision December 20, 2006: Structural Engineer's Letters of Assurance for design & field review of entry canopy are required prior to occupancy. DT |
| Application Status: | COMPLETED |
| Permit Value: | $200,000.00 |
| Builder: | ISLAND WEST COAST DEVELOPMENTS |
| Issued Date: | November 08, 2006 |
| File Close Date: | January 15, 2007 |
Associated Properties
| Address | Zone | More |
|---|---|---|
| 5801 TURNER ROAD | CC3 | Property Report |
Process Steps
| Task | Status |
|---|---|
|
UNDERSLAB PLUMBING
complete underslab plumbing must be visible. |
FAILED |
|
UNDERSLAB PLUMBING
complete underslab plumbing must be visible. |
PASSED |
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PASSED |
|
ROUGH IN SPRINKLER
Rough in sprinkler must be complete and visable for inspection. |
PARTIAL |
|
SPRINKLER FINAL-OLD
Sprinkler system must be complete and operating as intended. |
PARTIAL |
|
SPRINKLER FINAL-OLD
Sprinkler system must be complete and operating as intended. |
PASSED |
|
PLUMBING FINAL-OLD
All fixtures must be in place. |
PARTIAL |
|
PLUMBING FINAL-OLD
All fixtures must be in place. |
PASSED |
|
FINAL-OLD
Final approval as per requirements on plans. |
PARTIAL |
|
FINAL-OLD
Final approval as per requirements on plans. |
PASSED
2007-01-15 |
| Map |
|---|
View in Google Earth (KML)
|
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.

View in Google Earth (KML)