| Neighbourhood: | Newcastle/Brechin |
| Street Address: | 280 Caledonia |
| Type of Application: | Commercial / Multi / Industrial |
| File Number: | BP110526 |
| Date Application Submitted: | August 03, 2006 |
| Application Description: |
FOUNDATION & onsite servicing permit only for future Millstone Stationhouse Townhomes - 2 4plexes and 1 SFD. X ref BP110459 for main building permit. Construction shall not proceed beyond the foundation stage until BP110459 is issued. This permit includes forms, perimeter drain, underslab plumbing inspections & on site servicing inspections only. Proposed addresses (for future Strata): Building 1 Unit 1 - 335 Mt Benson Street Unit 2 - 339 Mt Benson Street Unit 3 - 343 Mt Benson Street Unit 4 - 347 Mt Benson Street Building 2 Unit 5 - 266 Caledonia Avenue Unit 6 - 262 Caledonia Avenue Unit 7 - 258 Caledonia Avenue Unit 8 - 254 Caledonia Avenue SFD Bld 3 Unit 9 - 250 Caledonia Avenue Future permits required for two 4plexes and sfd. FOUNDATION BP COMPLETE. SUPERCEDED BY BP110459 Physical File Scanned + attached Oct 8, 2008 db |
| Application Status: | COMPLETED |
| Permit Value: | $300,000.00 |
| Builder: | ANKIDO HOLDINGS LTD |
| Issued Date: | August 22, 2006 |
| File Close Date: | March 12, 2008 |
Process Steps
| Task | Status |
|---|---|
|
FOOTING/FORMS
Inspection of forms prior to any cement being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. |
PARTIAL |
|
FOOTING/FORMS
Inspection of forms prior to any cement being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. |
PASSED |
|
PERIMETER DRAIN
For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering. |
PARTIAL |
|
PERIMETER DRAIN
For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering. |
PARTIAL |
|
PERIMETER DRAIN
For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering. |
PASSED |
|
FIRELINE
Fireline for the sprinkler system must be complete and visable for inspection. |
PARTIAL |
|
STORM CONNECTION
Pipe and connection must be visible for inspection. |
PASSED |
|
STORM CONNECTION
Pipe and connection must be visible for inspection. |
CANCELLED |
|
STORM CONNECTION
Pipe and connection must be visible for inspection. |
PARTIAL |
|
STORM CONNECTION
Pipe and connection must be visible for inspection. |
PARTIAL |
|
SANITARY CONNECTION
Pipe and connection must be visible for inspection. |
PARTIAL |
|
WATER CONNECTION
Pipe and connection must be visible for inspection. |
PARTIAL |
| Map |
|---|
View in Google Earth (KML)
|
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.

View in Google Earth (KML)