BP110503 - 1260 College Dr
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search Again| BP110503 - 1260 College Dr | |
|---|---|
| Neighbourhood: | Westwood |
| Street Address: | 1260 College Dr |
| Type of Application: | Single / Two Family Dwelling |
| File Number: | BP110503 |
| Date Application Submitted: | July 27, 2006 |
| Application Description: |
Construct a two-storey single family dwelling on a slab, finished basement with Secondary Suite. B1-B2 and shop drawing received for sun room from Mike Herold DKF Revision approved: (1) Bedroom changed to Den (closet changed to shelves) (2) 220V power supply added: Radio power DT Revision approved December 27: (1) Construct secondary suite. (2) Add sink roughin for suite. (3) Change layout for rear deck. DKF. Revision Approved Jan 3, 2006: (1) Laundry Tub added to solarium. DT |
| Application Status: | COMPLETED |
| Permit Value: | $292,202.68 |
| Building Area: |
226.63 M2 2,439.42 ft2 |
| Builder: | PHEASANT HILL HOMES LTD |
| Issued Date: | September 11, 2006 |
| File Close Date: | April 11, 2007 |
Associated Properties
| Address | Zone | More |
|---|---|---|
| 1260 COLLEGE DRIVE | R5 | Property Report |
Process Steps
| Task | Status |
|---|---|
|
FOOTING / FORMS
Inspection of forms prior to any concrete being poured |
PASSED |
|
PERIMETER DRAIN
For perimeter drain , foundation walls should be damp proofed and drain tile in place with drain rock covering |
PASSED |
|
UNDERSLAB PLUMBING
Complete underslab plumbing must be visible |
PASSED |
|
STORM CONNECTION
Pipe and Connection must be visible for inspection |
PASSED |
|
SANITARY CONNECTION
Pipe and Connection must be visible for inspection |
PASSED |
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping |
FAILED |
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping |
PASSED |
|
FRAMING
Rough in plumbing and electrical must be complete. Survey Certificate & Truss Layouts required for approval |
FAILED |
|
FRAMING
Rough in plumbing and electrical must be complete. Survey Certificate & Truss Layouts required for approval |
PASSED |
|
INSULATION
Insulation and vapour barrier to be complete prior to inspection |
PASSED |
|
OCCUPANCY-OLD
Exterior of house must be complete including stairs, decks, handrails, porches and exterior finish |
FAILED |
|
OCCUPANCY-OLD
Exterior of house must be complete including stairs, decks, handrails, porches and exterior finish |
PASSED
2007-04-11 |
| Map |
|---|
View in Google Earth (KML)
|
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.

View in Google Earth (KML)