BP110483 - 6095 Uplands Drive (parent 6085 Uplands Drive) -- Drawings Scanned/Attached
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search Again| BP110483 - 6095 Uplands Drive (parent 6085 Uplands Drive) -- Drawings Scanned/Attached | |
|---|---|
| Neighbourhood: | Dover |
| Street Address: | 6095 Uplands Drive (parent 6085 Uplands Drive) -- Drawings Scanned/Attached |
| Type of Application: | Commercial / Multi / Industrial |
| File Number: | BP110483 |
| Date Application Submitted: | July 24, 2006 |
| Application Description: |
Senior's Apartment - 67 suites - new building No 9 separated by firewall to existing building No. 8 - 4 storey (combustible) with basement, Sprinklered with fire alarm system. Basement storage garage with vestibule to stairs and 1.5 hr FRR/FS for residential storage room. 2hr. FRR/FS between basement and first storey. Building area for storage garage = 1035m2. Building classification, 3.2.2.45, first, second and third storey = 1061m2 for each floor. Fourth floor = 981m2. Floor assemblies, 1 hr. FRR/FS floors, 1 hr. FRR/FS public corridor, 1hr FRR/FS 50 STM between units, 1.5 FRR/FS for Storage room, 1 hr. FRR/FS for roof assembly. Install Fire Stopping in attic to code. Self-closing devices to comply with 3.1.8.11. Fire dampers to 3.1.8.7. 20 min. labelled door assembly dwelling units. 45 min. labelled doors/closures in 1 hr. FRR/FS. Firewall = 1.5hr. Labelled door/closure hold open devices to comply with 3.1.8.12. x reference BP110848 for the foundation permit. |
| Application Status: | COMPLETED |
| Permit Value: | $4,800,000.00 |
| Builder: | RETIREMENT CONCEPTS DEVELOPMENTS LTD |
| Issued Date: | February 09, 2007 |
| File Close Date: | October 26, 2007 |
Process Steps
| Task | Status |
|---|---|
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PARTIAL |
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PARTIAL |
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
SCHEDULED |
|
ROUGH IN SPRINKLER
Rough in sprinkler must be complete and visable for inspection. |
PARTIAL |
|
ROUGH IN SPRINKLER
Rough in sprinkler must be complete and visable for inspection. |
PARTIAL |
|
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PARTIAL |
|
MONITORING FIELD REVIEW
A building official may attend the site from time to time during the course of construction to ascertain that the field reviews are taking place and to monitor the field reviews undertaken by the registered professional. |
PARTIAL |
|
MONITORING FIELD REVIEW
A building official may attend the site from time to time during the course of construction to ascertain that the field reviews are taking place and to monitor the field reviews undertaken by the registered professional. |
PARTIAL |
|
MONITORING FIELD REVIEW
A building official may attend the site from time to time during the course of construction to ascertain that the field reviews are taking place and to monitor the field reviews undertaken by the registered professional. |
PARTIAL |
|
MONITORING FIELD REVIEW
A building official may attend the site from time to time during the course of construction to ascertain that the field reviews are taking place and to monitor the field reviews undertaken by the registered professional. |
PARTIAL |
|
MONITORING FIELD REVIEW
A building official may attend the site from time to time during the course of construction to ascertain that the field reviews are taking place and to monitor the field reviews undertaken by the registered professional. |
PARTIAL |
|
MONITORING FIELD REVIEW
A building official may attend the site from time to time during the course of construction to ascertain that the field reviews are taking place and to monitor the field reviews undertaken by the registered professional. |
PARTIAL |
|
MONITORING FIELD REVIEW
A building official may attend the site from time to time during the course of construction to ascertain that the field reviews are taking place and to monitor the field reviews undertaken by the registered professional. |
PARTIAL |
|
MONITORING FIELD REVIEW
A building official may attend the site from time to time during the course of construction to ascertain that the field reviews are taking place and to monitor the field reviews undertaken by the registered professional. |
PARTIAL |
|
MONITORING FIELD REVIEW
A building official may attend the site from time to time during the course of construction to ascertain that the field reviews are taking place and to monitor the field reviews undertaken by the registered professional. |
PARTIAL |
|
PLUMBING FINAL-OLD
All fixtures must be in place. |
CANCELLED |
|
PLUMBING FINAL-OLD
All fixtures must be in place. |
PARTIAL |
|
PLUMBING FINAL-OLD
All fixtures must be in place. |
PASSED |
| OCCUPANCY-OLD | FAILED |
| OCCUPANCY-OLD |
PASSED
2007-10-26 |
| Map |
|---|
View in Google Earth (KML)
|
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.

View in Google Earth (KML)