BP110454 - 2793 Tamara Drive
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search Again| BP110454 - 2793 Tamara Drive | |
|---|---|
| Neighbourhood: | Diver Lake |
| Street Address: | 2793 Tamara Drive |
| Type of Application: | Single / Two Family Dwelling |
| File Number: | BP110454 |
| Date Application Submitted: | July 14, 2006 |
| Application Description: |
For construction of a 2-storey single family dwelling, slab-on-grade basement completely finished with Secondary Suite and a built-in garage. Oct 11/06 - paid for permit, but cheque made out incorrectly. He will be in Oct 12;/06 to exchange cheques - WP Revision Approved Nov 21, 2006: (1) Finish basement as a secondary suite. (2) Plumbing notes: 3pc washroom changed from RI to finished. 1 sink, 2 auto-washers added to basement. DT Revised drawings to show a 2 x 10 floor in lieu of a slab on grade, crawlspace is 42" in depth. 02/14/07 KM 2007-Aug-15 - HPO Registered Builder Form received - no longer Owner-Builder. |
| Application Status: | COMPLETED |
| Permit Value: | $203,644.00 |
| Building Area: |
167.00 M2 1,797.57 ft2 |
| Issued Date: | October 13, 2006 |
| File Close Date: | October 19, 2007 |
Associated Properties
| Address | Zone | More |
|---|---|---|
| 2793 TAMARA DRIVE | R5 | Property Report |
Process Steps
| Task | Status |
|---|---|
|
INFORMATION REQUEST
Information Requested from applicant. |
COMPLETED |
|
FOOTING / FORMS
Inspection of forms prior to any concrete being poured |
PASSED |
|
PERIMETER DRAIN
For perimeter drain , foundation walls should be damp proofed and drain tile in place with drain rock covering |
PASSED |
|
STORM CONNECTION
Pipe and Connection must be visible for inspection |
PASSED |
|
SANITARY CONNECTION
Pipe and Connection must be visible for inspection |
PASSED |
|
WATER CONNECTION
Pipe and Connection must be visable for inspection |
PASSED |
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping |
PARTIAL |
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping |
PASSED |
|
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
PASSED |
|
FRAMING
Rough in plumbing and electrical must be complete. Survey Certificate & Truss Layouts required for approval |
FAILED |
|
FRAMING
Rough in plumbing and electrical must be complete. Survey Certificate & Truss Layouts required for approval |
PASSED |
|
INSULATION
Insulation and vapour barrier to be complete prior to inspection |
PASSED |
|
OCCUPANCY-OLD
Exterior of house must be complete including stairs, decks, handrails, porches and exterior finish |
FAILED |
|
OCCUPANCY-OLD
Exterior of house must be complete including stairs, decks, handrails, porches and exterior finish |
PASSED
2007-10-19 |
| Map |
|---|
View in Google Earth (KML)
|
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.

View in Google Earth (KML)