BP110436 - 77 Skinner St. -- Drawings Scanned/Attached
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search Again| BP110436 - 77 Skinner St. -- Drawings Scanned/Attached | |
|---|---|
| Neighbourhood: | Downtown/Old City |
| Street Address: | 77 Skinner St. -- Drawings Scanned/Attached |
| Type of Application: | Commercial / Multi-Res Alteration |
| File Number: | BP110436 |
| Date Application Submitted: | July 10, 2006 |
| Application Description: |
Future Drift Restaurant - 32 m2 kitchen addition to existing 192.62m2 = 224.62m2, changing from health club to restaurant. Work includes kitchen addition, kitchen plumbing fixtures, range hood, garbage enclosure, trellis, retaining wall at stairs to lower floor. 1 hr FRR required for spatial separation construction requirements for north and part of south building face. Maximum occupant load for restaurant 76 patrons, maximum occupant load for patio 22 patrons. Combined occupant load for interior restaurant and patio 76 patron. Building classification 3.2.2.25 (1998) Group A2, 2 storey unsprinklered, no fire alarm, combustible construction, existing 45 min. rated floor and roof. |
| Application Status: | COMPLETED |
| Permit Value: | $35,000.00 |
| Issued Date: | August 29, 2006 |
| File Close Date: | December 19, 2006 |
Associated Properties
| Address | Zone | More |
|---|---|---|
| 77 SKINNER STREET | DT5 | Property Report |
Process Steps
| Task | Status |
|---|---|
|
FOOTING/FORMS
Inspection of forms prior to any concrete being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. |
PASSED |
|
UNDERSLAB PLUMBING
complete underslab plumbing must be visible. |
PASSED |
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PARTIAL |
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PARTIAL |
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
CANCELLED |
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PARTIAL |
|
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PASSED |
|
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PASSED |
|
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PASSED |
|
PLUMBING FINAL-OLD
All fixtures must be in place. |
FAILED |
|
PLUMBING FINAL-OLD
All fixtures must be in place. |
PASSED |
|
FINAL-OLD
Final approval as per requirements on plans. |
FAILED |
|
FINAL-OLD
Final approval as per requirements on plans. |
FAILED |
|
FINAL-OLD
Final approval as per requirements on plans. |
PASSED
2006-12-19 |
| Map |
|---|
View in Google Earth (KML)
|
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.

View in Google Earth (KML)