BP110424 - 6010 Uplands (Parent) P2, Bldgs 4-6, SL13-24 VIS6153 6024-6046 Leah Lane Scanned

Interested in this application? Login to manage subscriptions to subscribe to updates!

Search Again
BP110424 - 6010 Uplands (Parent) P2, Bldgs 4-6, SL13-24 VIS6153 6024-6046 Leah Lane Scanned
Neighbourhood: Dover    
Street Address: 6010 Uplands (Parent) P2, Bldgs 4-6, SL13-24 VIS6153 6024-6046 Leah Lane Scanned
Type of Application: Commercial / Multi / Industrial
File Number: BP110424
Date Application Submitted: July 06, 2006
Application Description: Phase 2: Sentinal Park - Multifamily development - Two storey four plex buildings on crawl space. X-reference BP110484 for foundations.

Building 4
6024 - Leah Lane- 1190 sq.ft. (110.551 m2) upper
6026 - Leah Lane- 1205 sq.ft. (111.945 m2) lower
6028 - Leah Lane- 1205 sq.ft. (111.945 m2) lower
6030 - Leah Lane- 1200 sq.ft. (111.48 m2) upper

Building 5
6032 - Leah Lane- 1190 sq.ft. (110.551 m2) upper
6034 - Leah Lane- 1205 sq.ft. (111.945 m2) lower
6036- Leah Lane- 1205 sq.ft. (111.945 m2) lower
6038 - Leah Lane- 1200 sq.ft. (111.48 m2) upper

Building 6 - next to Uplands Drive
6040 - Leah Lane- 1190 sq.ft. (110.551 m2) upper
6042 - Leah Lane- 1205 sq.ft. (111.945 m2) lower
6044 - Leah Lane- 1205 sq.ft. (111.945 m2) lower
6046 - Leah Lane- 1200 sq.ft. (111.48 m2) upper

Sprinkler equivalency for window exposing exit from upper units.
Physical File Scanned + attached Oct 22, 2008 db
Application Status: COMPLETED
Permit Value: $1,150,600.00
Builder: NORED DEVELOPMENTS INC
Issued Date: August 16, 2006
File Close Date: April 26, 2007

Associated Properties

Address Zone More
6042 LEAH LANE R6 Property Report
6044 LEAH LANE R6 Property Report
6040 LEAH LANE R6 Property Report
6046 LEAH LANE R6 Property Report
6036 LEAH LANE R6 Property Report
6026 LEAH LANE R6 Property Report
6028 LEAH LANE R6 Property Report
6024 LEAH LANE R6 Property Report
6030 LEAH LANE R6 Property Report
6034 LEAH LANE R6 Property Report
6032 LEAH LANE R6 Property Report
6038 LEAH LANE R6 Property Report
6010 UPLANDS DRIVE R6 Property Report

Process Steps

Task Status
PERIMETER DRAIN

For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering.

PARTIAL
PERIMETER DRAIN

For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering.

PASSED
STORM CONNECTION

Pipe and connection must be visible for inspection.

PASSED
SANITARY CONNECTION

Pipe and connection must be visible for inspection.

PASSED
WATER CONNECTION

Pipe and connection must be visible for inspection.

FAILED
ROUGH IN PLUMBING

Rough in plumbing must be complete including potable water piping.

PARTIAL
PAPER/FLASHING/WATERPROOFING

When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco.

PASSED
ROUGH IN SPRINKLER

Rough in sprinkler must be complete and visable for inspection.

CANCELLED
ROUGH IN SPRINKLER

Rough in sprinkler must be complete and visable for inspection.

FAILED
ROUGH IN SPRINKLER

Rough in sprinkler must be complete and visable for inspection.

CANCELLED
ROUGH IN SPRINKLER

Rough in sprinkler must be complete and visable for inspection.

CANCELLED
ROUGH IN SPRINKLER

Rough in sprinkler must be complete and visable for inspection.

FAILED
FRAMING

Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval.

PASSED
FRAMING

Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval.

PARTIAL
INSULATION

Insulation and vapour barrier to be complete prior to inspection.

PARTIAL
INSULATION

Insulation and vapour barrier to be complete prior to inspection.

PARTIAL
INSULATION

Insulation and vapour barrier to be complete prior to inspection.

PARTIAL
INSULATION

Insulation and vapour barrier to be complete prior to inspection.

PASSED
SPRINKLER FINAL-OLD

Sprinkler system must be complete and operating as intended.

PARTIAL
SPRINKLER FINAL-OLD

Sprinkler system must be complete and operating as intended.

PARTIAL
SPRINKLER FINAL-OLD

Sprinkler system must be complete and operating as intended.

FAILED
SPRINKLER FINAL-OLD

Sprinkler system must be complete and operating as intended.

PASSED
SPRINKLER FINAL-OLD

Sprinkler system must be complete and operating as intended.

PARTIAL
SPRINKLER FINAL-OLD

Sprinkler system must be complete and operating as intended.

PASSED
PLUMBING FINAL-OLD

All fixtures must be in place.

CANCELLED
OCCUPANCY-OLD CANCELLED
OCCUPANCY-OLD FAILED
OCCUPANCY-OLD PARTIAL
OCCUPANCY-OLD FAILED
OCCUPANCY-OLD PARTIAL
OCCUPANCY-OLD PASSED

2007-04-26

FINAL-OLD

Final approval as per requirements on plans.

PASSED

2007-04-24

Map
View in Google Earth (KML)


Disclaimer:

The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo. Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation. The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.