BP110410 - 50 Tenth -- Drawings Scanned/Attached
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search Again| BP110410 - 50 Tenth -- Drawings Scanned/Attached | |
|---|---|
| Neighbourhood: | Harewood |
| Street Address: | 50 Tenth -- Drawings Scanned/Attached |
| Type of Application: | Commercial / Multi / Industrial |
| File Number: | BP110410 |
| Date Application Submitted: | June 29, 2006 |
| Application Description: |
Addition to building of 369 m2 to create 3 Commercial Retail Units (CRU) - Units 105 to 108. CRU 105 / 106 combined unit for - Curves Fitness (Group D) - 185 sq m. Tenant improvement included under this permit New 45min FRR/FS Demising Wall between units 106 / 107, Separate permit required for tenant improvement for unit 107 and unit 108. Building is divided by two firewalls into three buildings. 1st building - Grocery store Group E, 3.2.2.62, 1492 m2; 2nd building (non sprinklered) - Group E/A2 , 3.2.2.28, 722 m2; 3rd building - (including new addition) Group E, 3.2.2.62, 1417m2. All buildings combustible construction, bldg 1 & 3 sprinklered with fire alarm system. see BP044751 for DCC Credit. |
| Application Status: | COMPLETED |
| Permit Value: | $360,000.00 |
| Builder: | MAPLE GLEN HOLDINGS LTD |
| Issued Date: | August 23, 2006 |
| File Close Date: | January 15, 2007 |
Process Steps
| Task | Status |
|---|---|
|
FOOTING/FORMS
Inspection of forms prior to any cement being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. |
PASSED |
|
PERIMETER DRAIN
For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering. |
PASSED |
|
UNDERSLAB PLUMBING
complete underslab plumbing must be visible. |
PARTIAL |
|
UNDERSLAB PLUMBING
complete underslab plumbing must be visible. |
PASSED |
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PARTIAL |
|
ROUGH IN SPRINKLER
Rough in sprinkler must be complete and visable for inspection. |
FAILED |
|
ROUGH IN SPRINKLER
Rough in sprinkler must be complete and visable for inspection. |
PARTIAL |
|
ROUGH IN SPRINKLER
Rough in sprinkler must be complete and visable for inspection. |
PASSED |
|
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
CANCELLED |
|
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PARTIAL |
|
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
CANCELLED |
|
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PARTIAL |
|
SPRINKLER FINAL-OLD
Sprinkler system must be complete and operating as intended. |
PASSED |
|
PLUMBING FINAL-OLD
All fixtures must be in place. |
FAILED |
|
PLUMBING FINAL-OLD
All fixtures must be in place. |
PARTIAL |
|
PLUMBING FINAL-OLD
All fixtures must be in place. |
PASSED |
|
FINAL-OLD
Final approval as per requirements on plans. |
FAILED |
|
FINAL-OLD
Final approval as per requirements on plans. |
PASSED
2007-01-15 |
| Map |
|---|
View in Google Earth (KML)
|
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.

View in Google Earth (KML)