BP110288 - 1608 Mallard Drive
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search Again| BP110288 - 1608 Mallard Drive | |
|---|---|
| Neighbourhood: | Northfield |
| Street Address: | 1608 Mallard Drive |
| Type of Application: | Single / Two Family Alteration |
| File Number: | BP110288 |
| Date Application Submitted: | May 30, 2006 |
| Application Description: |
Demolish existing deck. Add new, approx 20 x 52 ft garage on right side of existing single family dwelling. Add 7 x 10 ft front entrance canopy. Install vinyl.siding. June 15, received additional drawings for approx 39x24 suite addition and new 12x16 deck at rear. Revisions: October 18 /2006 Extend roof over rear patio area to make covered carport. 11'x 24' approx. DKF Revisions: January 23/2007 Window revisions. |
| Application Status: | COMPLETED |
| Permit Value: | $165,134.53 |
| Building Area: |
85.84 M2 923.97 ft2 |
| Issued Date: | June 22, 2006 |
| File Close Date: | May 09, 2007 |
Associated Properties
| Address | Zone | More |
|---|---|---|
| 1608 MALLARD DRIVE | R5 | Property Report |
Process Steps
| Task | Status |
|---|---|
|
MONITORING FIELD REVIEW
A building official may attend the site from time to time during the course of construction to ascertain that the field reviews are taking place and to monitor the field reviews undertaken by the registered professional. |
COMPLETED |
|
FOOTING/FORMS
Inspection of forms prior to any concrete being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. |
PASSED |
|
PERIMETER DRAIN
For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering. |
PASSED |
|
UNDERSLAB PLUMBING
Complete underslab plumbing must be visible |
PASSED |
|
ROUGH IN PLUMBING
Rough In plumbing must be complete including water piping. |
PASSED |
|
ROUGH IN PLUMBING
Rough In plumbing must be complete including water piping. |
PASSED |
|
ROUGH IN PLUMBING
Rough In plumbing must be complete including water piping. |
CANCELLED |
|
FRAMING
Rough in plumbing & electrical must be complete. |
FAILED |
|
FRAMING
Rough in plumbing & electrical must be complete. |
PASSED |
|
INSULATION
Insulation and vapour barrier to be complete prior to inspection |
PASSED |
|
FINAL-OLD
Final approval as per requirements on plans. |
PASSED
2007-05-09 |
| Map |
|---|
View in Google Earth (KML)
|
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.

View in Google Earth (KML)