BP110201 - 980 Malaspina crescent
Neighbourhood: Newcastle/Brechin    
Street Address: 980 Malaspina crescent
Type of Application: Garage / Carport Permit
File Number: BP110201
Date Application Submitted: May 09, 2006
Application Description: Demolish existing carport. Add approx 21 x 28 ft garage addition and 6 x 10 ft foyer addition at front of existing single family dwelling. Interior renovations to main and lower floor (powder room addition and ensuite renovation)

BOV00307

Nov 21, 2008 - See events TW

BCLS Certificate of Location attached db
Application Status: COMPLETED
Permit Value: $65,000.00
Building Area: 6.13 M2
65.98 ft2
Issued Date: May 26, 2006
File Close Date: October 09, 2009

Associated Properties

Address Zone More
980 MALASPINA CRESCENT R5 Property Report

Process Steps

Task Status
LATERAL BRACING & SHEATHING

All nailing and blocking associated with braced wall panels to be completed for this inspection. Wood-based interior braced wall panels to be sheathed. Exterior braced wall panel locations to be clearly marked out on the interior and exterior. Interior braced wall panels to be clearly marked so their location can be seen now and later at the time of INTERIOR BRACED WALL PANEL INSPECTION. Additional anchor bolts shall be installed two per braced wall panel where a building contains framed walls supporting more than two floors.

COMPLETED
FOOTING/FORMS

Inspection of forms prior to any cement being poured . For footing inspection, forms must be complete and approved plans (complete with City Stamp) must be onsite.

PARTIAL
PERIMETER DRAIN

For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering.

PASSED
UNDERSLAB PLUMBING

Complete underslab plumbing must be visible.

FAILED
UNDERSLAB PLUMBING

Complete underslab plumbing must be visible.

PASSED
ROUGH IN PLUMBING

Pipe and connection must be visable for inspection.

PARTIAL
ROUGH IN PLUMBING

Pipe and connection must be visable for inspection.

PARTIAL
FRAMING

Rough-in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval.

PARTIAL
FRAMING

Rough-in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval.

PARTIAL
INSULATION

Insulation and vapour barrier to be complete prior to inspection.

PASSED
FINAL-OLD

Final Approval as per requested on plans.

FAILED
FINAL-OLD

Final Approval as per requested on plans.

FAILED
FINAL-OLD

Final Approval as per requested on plans.

PASSED

2009-10-09

Map
View in Google Earth (KML)


Disclaimer:

The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo. Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation. The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.

The Information Provided within this website is for Informational Purposes Only. It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.