BP110198 - 5178 Dunn Pl
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search Again| BP110198 - 5178 Dunn Pl | |
|---|---|
| Neighbourhood: | North Slope |
| Street Address: | 5178 Dunn Pl |
| Type of Application: | Single / Two Family Dwelling |
| File Number: | BP110198 |
| Date Application Submitted: | May 09, 2006 |
| Application Description: |
For construction single family dwelling on a daylight basement. Basement finished. Revisions January 22 / 2007: 1) Grades changed, revised survey. 2) Patio at rear is now framed and elevated. 3) Bath in basement has been moved and 2peice has been added. 4) Windows added on both side elevations. 5) Average finished grade is now 69.91m and Max roof peak is 78.16m |
| Application Status: | COMPLETED |
| Permit Value: | $288,635.52 |
| Building Area: |
288.79 M2 3,108.51 ft2 |
| Builder: | IRA LEWIS CONSTRUCTION LTD |
| Issued Date: | September 06, 2006 |
| File Close Date: | August 23, 2007 |
Associated Properties
| Address | Zone | More |
|---|---|---|
| 5178 DUNN PLACE | R10 | Property Report |
Process Steps
| Task | Status |
|---|---|
|
FOOTING / FORMS
Inspection of forms prior to any concrete being poured |
PASSED |
|
PERIMETER DRAIN
For perimeter drain , foundation walls should be damp proofed and drain tile in place with drain rock covering |
PASSED |
|
UNDERSLAB PLUMBING
Complete underslab plumbing must be visible |
CANCELLED |
|
UNDERSLAB PLUMBING
Complete underslab plumbing must be visible |
PASSED |
|
STORM CONNECTION
Pipe and Connection must be visible for inspection |
CANCELLED |
|
STORM CONNECTION
Pipe and Connection must be visible for inspection |
PASSED |
|
SANITARY CONNECTION
Pipe and Connection must be visible for inspection |
CANCELLED |
|
SANITARY CONNECTION
Pipe and Connection must be visible for inspection |
PASSED |
|
WATER CONNECTION
Pipe and Connection must be visable for inspection |
CANCELLED |
|
WATER CONNECTION
Pipe and Connection must be visable for inspection |
PASSED |
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping |
PASSED |
|
FRAMING
Rough in plumbing and electrical must be complete. Survey Certificate & Truss Layouts required for approval |
CANCELLED |
|
FRAMING
Rough in plumbing and electrical must be complete. Survey Certificate & Truss Layouts required for approval |
PARTIAL |
|
FRAMING
Rough in plumbing and electrical must be complete. Survey Certificate & Truss Layouts required for approval |
PASSED |
|
INSULATION
Insulation and vapour barrier to be complete prior to inspection |
PASSED |
|
OCCUPANCY-OLD
Exterior of house must be complete including stairs, decks, handrails, porches and exterior finish |
FAILED |
|
OCCUPANCY-OLD
Exterior of house must be complete including stairs, decks, handrails, porches and exterior finish |
PASSED
2007-08-23 |
| Map |
|---|
View in Google Earth (KML)
|
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.

View in Google Earth (KML)