BP110120 - 2349 Delinea Place - 3251 Shenton Road (parent) -- Drawings Scanned/Attached

Interested in this application? Login to manage subscriptions to subscribe to updates!

Search Again
BP110120 - 2349 Delinea Place - 3251 Shenton Road (parent) -- Drawings Scanned/Attached
Neighbourhood: Diver Lake    
Street Address: 2349 Delinea Place - 3251 Shenton Road (parent) -- Drawings Scanned/Attached
Type of Application: Commercial / Multi / Industrial
File Number: BP110120
Date Application Submitted: April 20, 2006
Application Description: (Steels Building) - 1117m2 one storey F-2 occupany with 92m2 mezzanine, industrial pre-fabricated warehouse with office and 26.8 m2 & 12.8m2 covered steel cutting area. Water curtain equivalency for 2hr FRR for spatial separation requirements of North Building face.

Building classification: BCBC1998 3.2.2.72. Group F-2 up to two storey, sprinklered with fire alarm system, combustible or non-combustible construction, 3/4 hr floors and supports if combustible, no rating required for mezzanine.

Oct. 30, 06 Engineering for Rack Storage System submitted. Schedule B1, B2 from R.K.E. Fabricius PEng.
Application Status: COMPLETED
Permit Value: $700,000.00
Builder: ISLAND WEST COAST DEVELOPMENTS
Issued Date: July 21, 2006
File Close Date: February 19, 2007

Associated Properties

Address Zone More
2349 DELINEA PLACE I3 Property Report

Process Steps

Task Status
FOOTING/FORMS

Inspection of forms prior to any cement being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite.

PASSED
FOOTING/FORMS

Inspection of forms prior to any cement being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite.

PASSED
PERIMETER DRAIN

For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering.

PASSED
UNDERSLAB PLUMBING

complete underslab plumbing must be visible.

FAILED
UNDERSLAB PLUMBING

complete underslab plumbing must be visible.

PASSED
ROUGH IN PLUMBING

Rough in plumbing must be complete including potable water piping.

PARTIAL
ROUGH IN SPRINKLER

Rough in sprinkler must be complete and visable for inspection.

PARTIAL
FRAMING

Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval.

CANCELLED
FRAMING

Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval.

PASSED
INSULATION

Insulation and vapour barrier to be complete prior to inspection.

PASSED
SPRINKLER FINAL-OLD

Sprinkler system must be complete and operating as intended.

PARTIAL
SPRINKLER FINAL-OLD

Sprinkler system must be complete and operating as intended.

FAILED
SPRINKLER FINAL-OLD

Sprinkler system must be complete and operating as intended.

PASSED
PLUMBING FINAL-OLD

All fixtures must be in place.

PARTIAL
PLUMBING FINAL-OLD

All fixtures must be in place.

PASSED
OCCUPANCY-OLD FAILED
OCCUPANCY-OLD FAILED
OCCUPANCY-OLD PASSED

2007-02-19

Map
View in Google Earth (KML)


Disclaimer:

The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo. Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation. The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.

The Information Provided within this website is for Informational Purposes Only. It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.