Street Address: 750 Third -- scanned
Type of Application: Commercial / Multi / Industrial
File Number: BP110071
Date Application Submitted: April 10, 2006
Application Description: Minor Hockey Storage 19.19mx 9.9m Addition to New Nanaimo Ice Centre (Twin Arena) Main floor area 5460m2 + addition 190m2 = 5650m2

Building classification BCBC1998 A-3 - 3.2.2.29 sprinklered with fire alarm, non-combustible construction, floor assemblies 2 hr fire separation, mezzanines 1 hr FRR., load bearing supports FRR as required for assemblies.
Application Status: COMPLETED
Permit Value: $350,000.00
Builder: TASK CONSTRUCTION MANAGEMENT INC
Issued Date: July 20, 2006
File Close Date: February 12, 2009

Associated Properties

Address Zone More
750 THIRD STREET PRC1 , PRC3 Property Report

Process Steps

Task Status
FOOTING/FORMS

Inspection of forms prior to any cement being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite.

PASSED
UNDERSLAB PLUMBING

complete underslab plumbing must be visible.

PASSED
ROUGH IN PLUMBING

Rough in plumbing must be complete including potable water piping.

PARTIAL
ROUGH IN PLUMBING

Rough in plumbing must be complete including potable water piping.

FAILED
ROUGH IN PLUMBING

Rough in plumbing must be complete including potable water piping.

PASSED
ROUGH IN SPRINKLER

Rough in sprinkler must be complete and visable for inspection.

PARTIAL
FRAMING

Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval.

PASSED
SPRINKLER FINAL-OLD

Sprinkler system must be complete and operating as intended.

FAILED
PLUMBING FINAL-OLD

All fixtures must be in place.

FAILED
PLUMBING FINAL-OLD

All fixtures must be in place.

PASSED
FINAL-OLD

Final approval as per requirements on plans.

CANCELLED
FINAL-OLD

Final approval as per requirements on plans.

FAILED
FINAL-OLD

Final approval as per requirements on plans.

PASSED

2009-02-12

Map
View in Google Earth (KML)


Disclaimer:

The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo. Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation. The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.

The Information Provided within this website is for Informational Purposes Only. It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.