BP109985 - 205 Seventh
Neighbourhood: Harewood    
Street Address: 205 Seventh
Type of Application: Single / Two Family Alteration
File Number: BP109985
Date Application Submitted: March 17, 2006
Application Description: Raise house 34" to accommodate new full height slab-on-grade basement, with a suite and complete renovation to house.

Revisions approved Sept 26, 2006:
(1) Geotech Technical memo received.
(2) Structural C-B & 4 Field memos received.
(3) Floor beams now flush above basement.
(4) Moved plumbing & added 3 fixtures.
(5) Deck size increased; stairway location changed.
(6) Gas fireplace added.
(7) Changed windows.
(8) Alternate basement framing plan reviewed at counter. (Home based bus.). Revision will be required if this option to be used.
DT

Add laundry sink. 11/03/06 KM
Application Status: RETIRED
Permit Value: $2,000,000.00
Building Area: 71.30 M2
767.47 ft2
Issued Date: April 25, 2006
File Close Date: February 28, 2011

Associated Properties

Address Zone More
205 SEVENTH STREET R5 Property Report

Process Steps

Task Status
MONITORING FIELD REVIEW

A building official may attend the site from time to time during the course of construction to ascertain that the field reviews are taking place and to monitor the field reviews undertaken by the registered professional.

COMPLETED
PERIMETER DRAIN

For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering.

PASSED
UNDERSLAB PLUMBING

Complete underslab plumbing must be visible

PASSED
STORM CONNECTION

Pipe and Connection must be visible for inspection

PASSED
SANITARY CONNECTION

Pipe and Connection must be visible for inspection

PASSED
WATER CONNECTION

Pipe and Connection must be visable for inspection

PASSED
PAPER/FLASHING/WATERPROOFING

When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco.

PASSED
ROUGH IN PLUMBING

Rough In plumbing must be complete including water piping.

FAILED
ROUGH IN PLUMBING

Rough In plumbing must be complete including water piping.

PARTIAL
FRAMING

Rough in plumbing & electrical must be complete.

PASSED
INSULATION

Insulation and vapour barrier to be complete prior to inspection

PARTIAL
FINAL-OLD

Final approval as per requirements on plans.

PARTIAL
Map
View in Google Earth (KML)


Disclaimer:

The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo. Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation. The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.

The Information Provided within this website is for Informational Purposes Only. It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.