Search Again| BP109760 - 19 Nicol St - Drawings Scanned/Attached | |
|---|---|
| Neighbourhood: | South End |
| Street Address: | 19 Nicol St - Drawings Scanned/Attached |
| Type of Application: | Commercial / Multi / Industrial |
| File Number: | BP109760 |
| Date Application Submitted: | January 18, 2006 |
| Application Description: | xref. BP 109951 for the foundation.New Hope Centre, Emergency, transitional & long-term housing.16 self-contained (dwelling) units & 8 single units, 5 double units.Group C, sprinklered (NFPA 13R), fire alarm, Building area 314 m2, 4 storeys, 2 hr non combustible firewall /1.5 hr doors between buildings,standpipes to (NFPA 14), Accessible for person with disabilities, 1 hr FRR/FS floor assemblies and 1 hr FRR load bearing bearing supports, 50 STM between dwelling /sleeping units.20 min labelled door for dwelling /sleep units only. 45 min door for 1 hr Fire separation, 1 hr FRR/FS to be continuous to the underside of the roof deck or to the underside of a one hour Fire separation for the roof assembly. 1 hr FRR/FS public corridor, 1hr FRR/FS exits, listed fire stops and fire dampers required for penetration through fire separations. Exposed building faces north elevation 1hr FRR non-combustibles plus equivalencies for elevator opening into exit lobby and for glazing in public corridor. |
| Application Status: | COMPLETED |
| Permit Value: | $1,840,000.00 |
| Builder: | R W (BOB) WALL CONTRACTING LTD |
| Issued Date: | March 21, 2006 |
| File Close Date: | March 14, 2007 |
Associated Properties
| Address | Zone | More |
|---|---|---|
| 19 NICOL STREET | DT4 | Property Report |
Process Steps
| Task | Status |
|---|---|
|
WATER CONNECTION
Pipe and connection must be visible for inspection. |
PARTIAL |
|
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PARTIAL |
|
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
CANCELLED |
|
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PARTIAL |
|
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PARTIAL |
|
SPRINKLER FINAL-OLD
Sprinkler system must be complete and operating as intended. |
PASSED |
|
PLUMBING FINAL-OLD
All fixtures must be in place. |
PASSED |
| OCCUPANCY-OLD |
PASSED
2007-03-14 |
|
FINAL-OLD
Final approval as per requirements on plans. |
CANCELLED |
|
FINAL-OLD
Final approval as per requirements on plans. |
FAILED |
| Map |
|---|
View in Google Earth (KML)
|
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.

View in Google Earth (KML)