BP109676 - 1650 Waddington -- Drawings Scanned/Attached

Interested in this application? Login to manage subscriptions to subscribe to updates!

Search Again
BP109676 - 1650 Waddington -- Drawings Scanned/Attached
Neighbourhood: Townsite    
Street Address: 1650 Waddington -- Drawings Scanned/Attached
Type of Application: Commercial / Multi / Industrial
File Number: BP109676
Date Application Submitted: January 04, 2006
Application Description: First Baptist Church - FOUNDATION ONLY for 369.5m2 addition to 1170m2 existing church. No work permitted beyond the perimeter drain installation and underslab plumbing without issuance of BP109675.

Existing building + addition will be 1539.5m2. New classification for building under BCBC 1998 will be 3.2.2.26. Group A-2, sprinklered, 2 storey, <2400m2, combustible or non-combustible, 45 minute floors and supports.
Application Status: COMPLETED
Permit Value: $180,000.00
Builder: R W (BOB) WALL CONTRACTING LTD
Issued Date: March 02, 2006
File Close Date: January 31, 2007

Associated Properties

Address Zone More
1650 WADDINGTON ROAD CS1 Property Report

Process Steps

Task Status
FOOTING/FORMS

Inspection of forms prior to any cement being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite.

PARTIAL
FOOTING/FORMS

Inspection of forms prior to any cement being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite.

PASSED
PERIMETER DRAIN

For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering.

PASSED
FIRELINE

Fireline for the sprinkler system must be complete and visable for inspection.

FAILED
UNDERSLAB PLUMBING

complete underslab plumbing must be visible.

PARTIAL
UNDERSLAB PLUMBING

complete underslab plumbing must be visible.

PARTIAL
WATER CONNECTION

Pipe and connection must be visible for inspection.

FAILED
ROUGH IN PLUMBING

Rough in plumbing must be complete including potable water piping.

PARTIAL
ROUGH IN PLUMBING

Rough in plumbing must be complete including potable water piping.

PARTIAL
ROUGH IN PLUMBING

Rough in plumbing must be complete including potable water piping.

PARTIAL
INSULATION

Insulation and vapour barrier to be complete prior to inspection.

PARTIAL
FINAL-OLD

Final approval as per requirements on plans.

PASSED

2007-01-31

FINAL-OLD

Final approval as per requirements on plans.

CANCELLED
Map
View in Google Earth (KML)


Disclaimer:

The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo. Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation. The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.