BP109664 - 207 SIXTH STREET
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search Again| BP109664 - 207 SIXTH STREET | |
|---|---|
| Neighbourhood: | Harewood |
| Street Address: | 207 SIXTH STREET |
| Type of Application: | Single / Two Family Alteration |
| File Number: | BP109664 |
| Date Application Submitted: | December 28, 2005 |
| Application Description: |
construction of an addition for a two bedroom legal suite. applicant was in and deleted the addition shown on the plans. 03/23/06 KM. applicant revised the drawings to show a 6' addition. 07/07/06 KM |
| Application Status: | COMPLETED |
| Permit Value: | $58,000.00 |
| Builder: | PHEASANT HILL HOMES LTD |
| Issued Date: | February 08, 2006 |
| File Close Date: | November 09, 2006 |
Associated Properties
| Address | Zone | More |
|---|---|---|
| 207 SIXTH STREET | R5 | Property Report |
Process Steps
| Task | Status |
|---|---|
|
FOOTING/FORMS
Inspection of forms prior to any concrete being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. |
PASSED |
|
PERIMETER DRAIN
For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering. |
PARTIAL |
|
PERIMETER DRAIN
For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering. |
FAILED |
|
PERIMETER DRAIN
For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering. |
PASSED |
|
UNDERSLAB PLUMBING
Complete underslab plumbing must be visible |
FAILED |
|
UNDERSLAB PLUMBING
Complete underslab plumbing must be visible |
PASSED |
|
ROUGH IN PLUMBING
Rough In plumbing must be complete including water piping. |
PARTIAL |
|
ROUGH IN PLUMBING
Rough In plumbing must be complete including water piping. |
PASSED |
|
FRAMING
Rough in plumbing & electrical must be complete. |
PASSED |
|
FRAMING
Rough in plumbing & electrical must be complete. |
PASSED |
|
INSULATION
Insulation and vapour barrier to be complete prior to inspection |
PASSED |
|
INSULATION
Insulation and vapour barrier to be complete prior to inspection |
PASSED |
|
INSULATION
Insulation and vapour barrier to be complete prior to inspection |
PASSED |
|
FINAL-OLD
Final approval as per requirements on plans. |
FAILED |
|
FINAL-OLD
Final approval as per requirements on plans. |
PASSED
2006-11-09 |
| Map |
|---|
View in Google Earth (KML)
|
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.

View in Google Earth (KML)