BP109559 - 6165 Strathcona (parent Lot 1) - Unit #9 = 6187 Strathcona (SL2 VIS6123) Drawings Scanned/Attached

Interested in this application? Login to manage subscriptions to subscribe to updates!

Search Again
BP109559 - 6165 Strathcona (parent Lot 1) - Unit #9 = 6187 Strathcona (SL2 VIS6123) Drawings Scanned/Attached
Neighbourhood: Rutherford    
Street Address: 6165 Strathcona (parent Lot 1) - Unit #9 = 6187 Strathcona (SL2 VIS6123) Drawings Scanned/Attached
Type of Application: Commercial / Multi / Industrial
File Number: BP109559
Date Application Submitted: November 23, 2005
Application Description: Strathcona Estates - 10 unit Multi - family site - Phase 1 (3 SFD under different BP's) of Lot 1. This permit includes one sprinklered single family dwelling of three storeys on partial slab and partial crawl, built-in garage on lowest level.
Works and services / landscaping for Lot 1 under BP109560

6187 Strathcona - Unit 9- 184.83m2 gross living area, 40m2 garage

Oct. 06 Stratified = Strata Lot 2, Plan VIS6123
Application Status: COMPLETED
Permit Value: $185,700.00
Builder: ARRIS CONSTRUCTION LTD
Issued Date: May 05, 2006
File Close Date: September 12, 2007

Associated Properties

Address Zone More
6165 STRATHCONA PLACE R8 Property Report
6187 STRATHCONA PLACE R8 Property Report

Process Steps

Task Status
FOOTING/FORMS

Inspection of forms prior to any cement being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite.

PASSED
PERIMETER DRAIN

For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering.

CANCELLED
PERIMETER DRAIN

For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering.

PARTIAL
UNDERSLAB PLUMBING

complete underslab plumbing must be visible.

PASSED
STORM CONNECTION

Pipe and connection must be visible for inspection.

CANCELLED
STORM CONNECTION

Pipe and connection must be visible for inspection.

PASSED
SANITARY CONNECTION

Pipe and connection must be visible for inspection.

CANCELLED
SANITARY CONNECTION

Pipe and connection must be visible for inspection.

CANCELLED
SANITARY CONNECTION

Pipe and connection must be visible for inspection.

CANCELLED
SANITARY CONNECTION

Pipe and connection must be visible for inspection.

PASSED
WATER CONNECTION

Pipe and connection must be visible for inspection.

CANCELLED
WATER CONNECTION

Pipe and connection must be visible for inspection.

PASSED
ROUGH IN PLUMBING

Rough in plumbing must be complete including potable water piping.

PARTIAL
ROUGH IN PLUMBING

Rough in plumbing must be complete including potable water piping.

PASSED
ROUGH IN SPRINKLER

Rough in sprinkler must be complete and visable for inspection.

PARTIAL
FRAMING

Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval.

PASSED
INSULATION

Insulation and vapour barrier to be complete prior to inspection.

PASSED
SPRINKLER FINAL-OLD

Sprinkler system must be complete and operating as intended.

PARTIAL
OCCUPANCY-OLD FAILED
OCCUPANCY-OLD PASSED

2007-09-06

Map
View in Google Earth (KML)


Disclaimer:

The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo. Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation. The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.