BP109552 - 5788 Garnet Place, 5790 Garnet Place - parent 5360 Rutherford -- Drawings Scanned/Attached

Interested in this application? Login to manage subscriptions to subscribe to updates!

Search Again
BP109552 - 5788 Garnet Place, 5790 Garnet Place - parent 5360 Rutherford -- Drawings Scanned/Attached
Neighbourhood: Linley Valley    
Street Address: 5788 Garnet Place, 5790 Garnet Place - parent 5360 Rutherford -- Drawings Scanned/Attached
Type of Application: Commercial / Multi / Industrial
File Number: BP109552
Date Application Submitted: November 22, 2005
Application Description: Tenth (last) phase of the 25 unit townhouse development -
1 two storey sprinklered Duplex on partial slab and partial crawl on lower level, attached garages (unsprinklered), 1 hour FRR/fire separation between units.
Block 1, unit 3- 5788 Garnet Place - 233.69 m2, garage 40m2
Block 1, unit 1- 5790 Garnet Place - 231 m2, garage 39.4m2
Application Status: COMPLETED
Permit Value: $418,000.00
Builder: 679327 BC LTD
Issued Date: July 12, 2006
File Close Date: June 12, 2007

Associated Properties

Address Zone More
5790 GARNET PLACE R6 Property Report
5788 GARNET PLACE R6 Property Report
5360 RUTHERFORD ROAD R6 Property Report

Process Steps

Task Status
FOOTING/FORMS

Inspection of forms prior to any cement being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite.

PASSED
PERIMETER DRAIN

For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering.

PARTIAL
PERIMETER DRAIN

For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering.

CANCELLED
UNDERSLAB PLUMBING

complete underslab plumbing must be visible.

PASSED
UNDERSLAB INSULATION

Inspection required prior to placing slab concrete.

PASSED
STORM CONNECTION

Pipe and connection must be visible for inspection.

PASSED
SANITARY CONNECTION

Pipe and connection must be visible for inspection.

PASSED
WATER CONNECTION

Pipe and connection must be visible for inspection.

PASSED
ROUGH IN PLUMBING

Rough in plumbing must be complete including potable water piping.

PASSED
ROUGH IN SPRINKLER

Rough in sprinkler must be complete and visable for inspection.

FAILED
FRAMING

Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval.

PASSED
INSULATION

Insulation and vapour barrier to be complete prior to inspection.

PASSED
SPRINKLER FINAL-OLD

Sprinkler system must be complete and operating as intended.

CANCELLED
SPRINKLER FINAL-OLD

Sprinkler system must be complete and operating as intended.

PARTIAL
SPRINKLER FINAL-OLD

Sprinkler system must be complete and operating as intended.

PASSED
PLUMBING FINAL-OLD

All fixtures must be in place.

PASSED
OCCUPANCY-OLD PASSED

2007-06-12

Map
View in Google Earth (KML)


Disclaimer:

The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo. Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation. The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.