BP109380 - 664 Nicol
Neighbourhood: South End    
Street Address: 664 Nicol
Type of Application: Locate Permit
File Number: BP109380
Date Application Submitted: October 03, 2005
Application Description: Relocated house to be placed on a new basement creating a two storey SFD with a finished main floor and unfinished basement.
Schedule CB Structural Received

April 15th, 2008 See events regarding permit renewal.

Stairwell added 2008-May-02 BAL
Application Status: COMPLETED
Permit Value: $65,075.20
Building Area: 134.36 M2
1,446.24 ft2
Issued Date: December 23, 2005
File Close Date: June 30, 2008

Associated Properties

Address Zone More
664 NICOL STREET COR1 Property Report

Process Steps

Task Status
COVENANT PREPARATION

type covenant, applicant to sign, city to notorize. Completed means that the covenant is ready to send to LTO. Completed status will create the task to track LTO registation

COMPLETED
FOOTING/FORMS

Inspection of Forms prior to any cement being poured. For Footing inspection, forms must be complete and approved plans (complete with City Stamp) must be onsite.

PASSED
PERIMETER DRAIN

For Perimeter Drain, foundation walls should be damp proofed and drain tile in place with drain rock covering.

FAILED
PERIMETER DRAIN

For Perimeter Drain, foundation walls should be damp proofed and drain tile in place with drain rock covering.

CANCELLED
PERIMETER DRAIN

For Perimeter Drain, foundation walls should be damp proofed and drain tile in place with drain rock covering.

FAILED
UNDERSLAB PLUMBING

Complete underslab plumbing must be visible.

FAILED
UNDERSLAB PLUMBING

Complete underslab plumbing must be visible.

PASSED
STORM CONNECTION

Pipe connection must be visible for inspection.

FAILED
STORM CONNECTION

Pipe connection must be visible for inspection.

PARTIAL
STORM CONNECTION

Pipe connection must be visible for inspection.

PASSED
SANITARY CONNECTION

Pipe Connection must be visible for inspection.

FAILED
SANITARY CONNECTION

Pipe Connection must be visible for inspection.

FAILED
SANITARY CONNECTION

Pipe Connection must be visible for inspection.

PARTIAL
SANITARY CONNECTION

Pipe Connection must be visible for inspection.

PASSED
WATER CONNECTION

Pipe Connection must be visible for inspection.

FAILED
WATER CONNECTION

Pipe Connection must be visible for inspection.

PARTIAL
WATER CONNECTION

Pipe Connection must be visible for inspection.

PASSED
FRAMING

When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco.

CANCELLED
FRAMING

When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco.

PASSED
ROUGH IN PLUMBING

Rough in plumbing must be complete including potable water piping.

FAILED
ROUGH IN PLUMBING

Rough in plumbing must be complete including potable water piping.

PASSED
LATERAL BRACING & SHEATHING

All nailing and blocking associated with braced wall panels to be completed for this inspection. Wood-based interior braced wall panels to be sheathed. Exterior braced wall panel locations to be clearly marked out on the interior and exterior. Interior braced wall panels to be clearly marked so their location can be seen now and later at the time of INTERIOR BRACED WALL PANEL INSPECTION. Additional anchor bolts shall be installed two per braced wall panel where a building contains framed walls supporting more than two floors.

FAILED
LATERAL BRACING & SHEATHING

All nailing and blocking associated with braced wall panels to be completed for this inspection. Wood-based interior braced wall panels to be sheathed. Exterior braced wall panel locations to be clearly marked out on the interior and exterior. Interior braced wall panels to be clearly marked so their location can be seen now and later at the time of INTERIOR BRACED WALL PANEL INSPECTION. Additional anchor bolts shall be installed two per braced wall panel where a building contains framed walls supporting more than two floors.

CANCELLED
LATERAL BRACING & SHEATHING

All nailing and blocking associated with braced wall panels to be completed for this inspection. Wood-based interior braced wall panels to be sheathed. Exterior braced wall panel locations to be clearly marked out on the interior and exterior. Interior braced wall panels to be clearly marked so their location can be seen now and later at the time of INTERIOR BRACED WALL PANEL INSPECTION. Additional anchor bolts shall be installed two per braced wall panel where a building contains framed walls supporting more than two floors.

PASSED
Map
View in Google Earth (KML)


Disclaimer:

The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo. Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation. The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.