BP109291 - 2211 Jingle Pot -- Drawings Scanned/Attached
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search Again| BP109291 - 2211 Jingle Pot -- Drawings Scanned/Attached | |
|---|---|
| Neighbourhood: | Westwood |
| Street Address: | 2211 Jingle Pot -- Drawings Scanned/Attached |
| Type of Application: | Commercial / Multi / Industrial |
| File Number: | BP109291 |
| Date Application Submitted: | September 09, 2005 |
| Application Description: |
Jingle Pot Liquor Store - New 198.6m2 "E" occupancy, combustible building, sprinklered by bylaw. One hour FRR rating required for rear building face for spatial separation construction requirements. Existing building Jingle Pot Pub & Liquor Store 455.35m2, Work previouly done without permit plus upgrades to be included under this permit includes: Kitchen addition 42.5m2, additional footing to be added and wall to be upgraded for 1 hr FRR with 5/8" type X drywall and non-combustible siding; enclosure of front walkway 37m2, for wind protection, space is unheated; addition of door through room currently used for liquor shelves to meet travel distance requirements to exit; install exit doors from patio, completely remove structure in patio area supporting a retractable roof and space heaters. Revised building classification for the Pub under BCBC1998 - 534.85m2, A-2 - 3.2.2.28. unsprinklered, facing 2 streets, combustible construction. April 4, 06 Pub exit revision. VS |
| Application Status: | COMPLETED |
| Permit Value: | $340,000.00 |
| Builder: | ISLAND WEST COAST DEVELOPMENTS |
| Issued Date: | November 23, 2005 |
| File Close Date: | May 25, 2006 |
Associated Properties
| Address | Zone | More |
|---|---|---|
| 2211 JINGLE POT ROAD | CC1 | Property Report |
Process Steps
| Task | Status |
|---|---|
|
FOOTING/FORMS
Inspection of forms prior to any cement being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. |
PASSED |
|
FOOTING/FORMS
Inspection of forms prior to any cement being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. |
PASSED |
|
PERIMETER DRAIN
For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering. |
PASSED |
|
FIRELINE
Fireline for the sprinkler system must be complete and visable for inspection. |
FAILED |
|
UNDERSLAB PLUMBING
complete underslab plumbing must be visible. |
PARTIAL |
|
STORM CONNECTION
Pipe and connection must be visible for inspection. |
FAILED |
|
WATER CONNECTION
Pipe and connection must be visible for inspection. |
PASSED |
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PARTIAL |
|
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
PASSED |
|
ROUGH IN SPRINKLER
Rough in sprinkler must be complete and visable for inspection. |
PASSED |
|
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
CANCELLED |
|
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
FAILED |
|
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PASSED |
|
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PASSED |
|
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PASSED |
|
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PARTIAL |
|
SPRINKLER FINAL-OLD
Sprinkler system must be complete and operating as intended. |
PARTIAL |
|
SPRINKLER FINAL-OLD
Sprinkler system must be complete and operating as intended. |
PASSED |
|
PLUMBING FINAL-OLD
All fixtures must be in place. |
FAILED |
|
PLUMBING FINAL-OLD
All fixtures must be in place. |
FAILED |
|
PLUMBING FINAL-OLD
All fixtures must be in place. |
PASSED |
| OCCUPANCY-OLD | FAILED |
| OCCUPANCY-OLD |
PASSED
2006-05-25 |
| Map |
|---|
View in Google Earth (KML)
|
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.

View in Google Earth (KML)